My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07644
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07644
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:28:15 PM
Creation date
10/12/2006 2:29:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141.600.20
Description
Fryingpan-Arkansas Project - Studies - Environmental Studies
State
CO
Basin
Arkansas
Water Division
5
Date
4/16/1975
Author
US DoI BoR
Title
Final Environmental Impact Statement Volume 2 of 2, Pages XI-231 to XI-421
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br /> <br />IN REPLY REfER TO <br /> <br />-'~"6 United States Department of the Interior <br /> <br />BUREAU OF LAND MANAGEMENT <br /> <br />5-911 <br />1792 <br /> <br />COLORADO STATE OFFICE <br />ROOM 700. COLORADO STATE SANK BUILDING <br />1600 BROADWAY <br />DENVER. COLORADO 80202 <br /> <br />JUN , <br /> <br />1!74 <br /> <br />Memorandum <br /> <br />To: Cormnissioner of Reclamation <br />Bureau of Reclamation, USDI <br />Washington, D.C. 20240 <br /> <br />From: State Director, Colorado <br /> <br />Subject: Review of Draft Environmental Statement for The Fryingpan- <br />Arkansas Project, Colorado <br /> <br />General: <br /> <br />. <br /> <br />We applaud the decision to cover the entire Fryingpan-Arkansas Project <br />in a single Environmental Statement. However, the organization of sub- <br />ject statement into pre-NEPA, post-NEPA under construction and post-NEPA <br />future results in much extraneous and redundant wordage. The sections <br />need to be tied together so the report will seem less like a collection of <br />mini-statements written independently. The environmental impact of dams <br />and reservoirs should be similar regardless of whether or not the con- <br />struction has been completed, in varying stages of completion, or to be <br />constructed. The present format results in including mitigating measures <br />as related to the "pre-NEPAl' phase of the project under environmental <br />impacts. <br /> <br />The statement does not evaluate the wilderness/scenic resources in and <br />adjacent to the project area. Although the Bureau of Reclamation intimates <br />that these areas exist -- "increased public access.. .hunting", (VIII-3), <br />"improvement of access...summer home complexes", (IV.3l), the resources <br />need to be determined, designated and evaluated before the impacts can <br />be understood. <br /> <br />Specific: <br /> <br />111-133, IV-45 and V-64. Has there been a resolution to the conflict of <br />historic/reclamation values in the Twin Lakes Village area? What historical <br />importance is attached to the physical properties described? What specific <br />mitigation measures are proposed for the possible flooding of this area? <br /> <br />. <br /> <br />IV-8 and VII-13. The environmental impact of private developers is briefly <br />listed. No mitigation measures are proposed in Section V, which indicates <br />the assumption is made that private development is a beneficial use of the <br />environment. <br /> <br />XI-235 <br />
The URL can be used to link to this page
Your browser does not support the video tag.