My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07461
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07461
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:27:26 PM
Creation date
10/12/2006 2:24:16 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8143.600.30
Description
John Martin Reservoir - Other Studies
State
CO
Basin
Arkansas
Water Division
2
Date
9/1/1982
Author
Dept of Army
Title
John Martin Dam and Reservoir - Small Hydropower Addition Reconnaissance Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />",' <br /> <br />. <br /> <br />. <br /> <br />August 1982 <br /> <br />FORT WORTH REGIONAL OFFICE <br /> <br />~) <br /> <br />~ <br />-..] <br />C/", <br /> <br />Assumptions and Methodology for .Computing <br />Generalized Power Values for PSA 32 <br /> <br />Item <br /> <br />Cost level: <br /> <br />January 1982 for plant investment. <br /> <br />Type of Financing Assumed: <br /> <br />Private (13.0 percent cost of money) <br />Federal ( 7 7/8 percent cost of money) <br /> <br />Interim Replacements - None <br /> <br />State and local taxes of 1.61% were <br />computed from weighted average taxes <br />of the major utilities for the years <br />1979, 1980 and 1981 (Form 1 data). <br /> <br />Ther~al Alternative Costs: <br /> <br />CONCEPT 5 Computer Program <br /> <br />The Program was run using estimates <br />of construction time for base load plants <br />with two units and with a private financing <br />rate of 13.0 percent and Federal financing <br />rate of 7 7/8 percent. The difference in <br />investment cost between "Federal" and <br />"private" is occasioned by the difference <br />. tn. financing rate dudng the construction <br />period. <br /> <br />Base load unit heat rates were taken <br />from information reported in Forms 1 and <br />12 and other data on file in the FWRO. <br /> <br />Generating unit sizes were selected <br />for the study area according to sizes <br />which are under construction or planned <br />(assumptions on each of the alternatives <br />are attached). <br /> <br />Alternative Plant Capaci_y <br />Factors Range: <br /> <br />o - 15% combustion turbine station (oil-fired) <br />15.1 - 100% coal-fired station <br />60.0 - 100% base load nuclear station <br />
The URL can be used to link to this page
Your browser does not support the video tag.