Laserfiche WebLink
<br />. PRELIMINARY. -- <br />SUBJECT TO REVISION <br />~~ losses to derive the net operating head. The modified pool elevation-duration <br />curves are shown on plate 5. <br /> <br />~ <br /> <br />Cl <br /> <br />r~ 3. In the event that a permanent pool is established which is less than <br /> <br /> <br />the 10.000 acre-feet maximum limit then the modified pool elevation-duration <br /> <br /> <br />curves would need to be reevaluated. The Colorado Division of wildlife has <br /> <br /> <br />estimated that 3000 acre-feet is the approximate minimum pool required to <br /> <br /> <br />maintain a sport fishery habitat. A review of the pool elevation-capacity\ <br /> <br /> <br />relationship for the reservoir indicates that there is a difference of less! <br /> <br /> <br />than five feet of head between a 3000 acre-feet pool and a 10.000 acre-feet i <br /> <br /> <br />pool. Resulting differences in power generating potential would be of similar) <br /> <br /> <br />proportions. <br /> <br />I <br />" <br />-- to...~.... <br />',...I~ . <br />.~.:.rv'{(:. , <br />" ". <br />("ft"', <br /> <br />4. . The modified net operating head for each month was used to calculate <br /> <br /> <br />the average energy values for each alternative plan. Table 7 lists the <br /> <br /> <br />average energy potential of the alternative plans assuming a 10.000 acre-feet <br /> <br /> <br />permanent pool. The impact of this increased energy generation on project <br /> <br /> <br />economic feasibility is shown below. <br /> <br />Benefit/Cost Ratio <br /> <br />-As is- <br />With Permanent Pool <br /> <br /> Alternative <br />I II III IV <br />1.63 1.79 1.68 1.17 <br />1.92 2.12 1.98 1.30 <br />300 5"'00 "'JX> goO <br /> <br />Q <br /> <br /> <br />~ Environmental and Cultural Considerations. <br /> <br />1. The U.S. Fish and Wildlife Service Ecological Services Field Office <br /> <br />-- <br />for Colorado has been informally contacted and informed of the project. As <br /> <br /> <br />plans are developed for the project. the appropriate documentation pursuant to <br /> <br /> <br />the National Environmental Policy Act will be prepared. <br /> <br />2. Coordination with the Endangered Species Section. U.S. Fish and <br />Wildlife Service. Salt Lake City. has revealed that the project lies within <br /> <br />17 <br />