My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07433
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07433
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:27:19 PM
Creation date
10/12/2006 2:22:35 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1983
Author
USDOI
Title
27th Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Salinity Control <br /> <br /> <br />. <br /> <br />~ .......... <br /> <br />,~. <br /> <br /> <br />Salinity crystals taken from Colorado area. <br /> <br />Progress is continuing on three of the four <br />authorized units under the Salinity Control <br />Prolect (Paradox, Grand Valley, Las Vegas <br />Wash). The accomplistlmenls in fiscal year <br />1983 are as follows <br /> <br />Paradox Valley Unit: Two Independent <br />consultants who reviewed the construction <br />specifications for the deep injection weJl <br />advised against proceeding at the proposed <br />well local ion because of anticipated problems <br />drilling through unstable salt formations. Based <br />on their reco~mendations, alternative sites are <br />being considered. When a new site is selected, <br />the well will be redesigned and drilling will <br />proceed. The schedule changes will delay the <br />contract award by about 14 monttlS to March <br />1985 <br /> <br />Grand Valley Unit: Except lor clean.up items, <br />construction is complete on Stage One of the <br />Grand Valley Unit. The Government Highline <br />Canal, Government Highline laterals and the <br />moss and debris removal structure have all <br />been completed. Monitoring is continuing to <br />verify salinity reductions. <br /> <br />Data collection for the Stage Two area is <br />continuing. Design data collection is under way <br />on the West End Government Highline Canal <br />and its laterals, and the Independent Ranch- <br /> <br />8 <br /> <br /> <br />Grand Valley laterals mitigate salinity. <br /> <br />men's laterals. These are the first areas that <br />will be constructed under Stage Two. Initiation <br />of construction is expected in early 1986. <br /> <br />The Draff Supplement 10 fhe Grand Valley Unit <br />Delinlle Plan Report, Stage Two Development <br />has been completed. <br /> <br />The recommended plan includes concrete <br />lining all laterals and concrete lining the West <br />End, Middle POlllon, and East End of Ihe <br />Government Highline Cana!. O:mcrete lining of <br />the middle and east portions of the Govern- <br />ment Highline Canal would be deferred until <br />needed to meet salinity goals. <br /> <br />Las Vegas Wash Unit <br /> <br />AfJer the Deflnlfe Plan Report was draffed In <br />1977, changing ground water conditions <br />delayed construction pending further investiga- <br />tions. <br /> <br />A reevaluation of the original evaporation <br />pond/desalting plan has resulted in considera- <br />tion of new concepts for salinity control. An <br />October 1982 status report recommended pro- <br />ceeding with a verification program to convey <br />low salinity industrial cooling water past an <br />area of highly saline soil, preventing ground- <br />water infiltration and salt pickup. <br /> <br />A continuing ground-water monitoring program <br /> <br /> <br />Salinity leaves its mark on this farmland <br /> <br />in the Lower Las Vegas Valley has been aug. <br />mented by Ihe addillon of aboul 50 new <br />observation wells. These wells are being used <br />to verify expected changes in ground-water <br />levels and quality belore and alter Ihe aban. <br />donment of unlined wastewater ditches in the <br />area. The curtailment of seepage from the <br />unlined ditches is expected to cause a rapid <br />drop in ground-water levels, resulting in <br />reduced saline ground-water inflow to Las <br />Vegas Wash. <br /> <br />Crystal Geyser Unit <br /> <br />The Crystal Geyser Unil has been delerred <br />indefinitely because of low cost-effectiveness. <br /> <br />The 10 units authorized lor planning under the <br />Water Quality Improvement Program are at <br />various stages within the planning process as <br />follows: <br /> <br />Big Sandy River Unit <br /> <br />A Joint State/Reclamalion Report was sent to <br />Ihe Sfale of Wyoming in December 1982 and <br />was presented to the Stale Legislature. A <br />meeting was held wifh Ihe Bureau of Land <br />Management, Ine National Park Service, and <br />Wyoming State archeologists to determine <br />locations where project pipelines could cross <br />historic trails with the least damage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.