My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07428
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07428
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:27:18 PM
Creation date
10/12/2006 2:21:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8583
Description
Rio Grande Decision Support System
State
CO
Basin
Rio Grande
Water Division
3
Date
12/1/1998
Author
CWCB
Title
General News Articles and Press Releases related to the RGDSS
Water Supply Pro - Doc Type
News Article/Press Release
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />c\J~rn3 <br /> <br />. <br /> <br />. <br /> <br />Department of Naturlll Resources --- Colorado Water Conservation Board -- Division of Water Resources <br /> <br />RECEIVEO <br />MM 2. 6 2000 <br /> <br />RGDSS Newsletter <br />Rio Grande Decision Support System <br /> <br />Randy Seaholm <br />CWCS <br />1313 Sherman Street Rm 721 <br />Denver, CO 80203 <br /> <br />d ula,pr <br />Colora 9 .. d <br />Conservation Boar <br /> <br />May 24, 2000 <br /> <br />Introduction This newsletter is intended to <br />keep the RGDSS Advisory Committee and other <br />interested parties up to date regarding current <br />RGDSS activities. We expect to publish it 2 - 4 <br />times a year. This is the 4th edition. <br /> <br />To meet the contracting team and discuss their <br />progress, an Advisory Committee (Ae) meeting <br />has been scheduled as follows: <br /> <br />RGDSS Advisory Meeting <br />1:00 Thursday, June 8, 2000 <br />Monte Vista Co Op <br />1901 East US Highway 160 <br />Monte Vista CO 81101 <br />Please RSVP to: <br />Ray Bennett (303) 866-3585 x 263 <br />Ralph Curtis (719) 589-6301 <br /> <br />Contract Summary Following is a <br />summary of progress under Phase 1 and 2 as of <br />April 30, 2000. <br /> <br />Component <br /> <br />Contractor <br /> <br />Phase 1&2 <br />% <br />Complete <br /> <br />45 <br /> <br />37 <br /> <br />Total <br /> <br />All <br /> <br />Ground Water <br /> <br />HRS Water <br />Consultants, Inc. <br /> <br />Hydrosphere <br />Resource <br />Consultants <br /> <br />65 <br /> <br />Surface Water <br /> <br />Consumptive <br />Use and Water <br />Budget <br /> <br />Relational <br />System <br />Integration <br /> <br />Spatial System <br />Integration <br /> <br />Leonard Rice <br />Consulting and <br />Agro Engineering <br /> <br />Riverside <br />Technology, inc. <br /> <br />80 <br /> <br />72 <br /> <br />HDR <br />Engineering, Inc. <br /> <br />95 <br /> <br />Ground Water Component Key <br />progress since the last newsletter and AC <br />meeting is as follows (the number in parentheses <br />refers to the contract Task): <br />. (4) Ground Water Budget Data is 50% <br />complete. <br />. (6) Data Collection Program design was <br />completed. <br />. (7) Hydrologic Data review was completed. <br />. (8) Develop a Preprocessor to MODFLOW <br />(StatePP) is approx. 75% complete. <br />. (10) Phase 1 Well Construction was <br />completed (3 wells constructed in Phase 1) <br />. (11) Phase I Well Testing is approx. 75% <br />complete (3 tests completed in Phase I). <br />. (15) Native ET Data review is approx. 85% <br />complete. <br />. (16) Pumping Data review was completed. <br />. (17) Drains, Springs and Flowing Well data <br />review is 90% complete. <br />. (18) Stream and Diversions data review is <br />60% complete. <br />. (19) Recharge and Rim Inflow data review <br />is 50% complete. <br />. (20) Head Data collection and review was <br />completed. <br />. (21) Model construction is approx. 40% <br />complete. This includes the assignment of <br />aquifer layers and initial hydrologic <br />parameters. <br />. (26) Phase 2 Well Construction is approx. <br />20% complete (2 wells constructed in Phase <br />2). <br />. (27) Phase 2 Drilling Observation is approx. <br />15% complete (2 wells constructed in Phase <br />2). <br /> <br />Surface Water Component Progress <br />since the last newsletter and AC meeting is as <br />follows (the number in parentheses refers to the <br />contract Task): <br /> <br />. (4) Basin Meetings are complete. <br /> <br />D:IW\RioGrandeIAdvisoryINews000524.doc OS/26/00 - I <br />
The URL can be used to link to this page
Your browser does not support the video tag.