Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />SUMMARY SHEET <br /> <br />EFFECTS ON THE COLORADO RIVER (average annual) <br /> <br />Decrease in salt load from Palo Verde subarea (tons) <br /> <br />Reduction in salt concentration at Imperial Dam from <br />decrease in salt load (mg/L) <br /> <br />, <br />v <br /> <br />, t <br /> <br />t, <br /> <br />t <br />') <br /> <br />" <br /> <br />\,' <br /> <br />PROJECT FEATURES <br /> <br />Laterals to be lined (miles) <br /> <br />ESTIMATED COSTS <br /> <br />Construction Costs (January 1981 costs) <br /> <br />Lining <br />IMS and onfarm program <br /> <br />Interest during construction <br /> <br />Total investment costs <br /> <br />Annual equivalent costs <br /> <br />Annual operating costs <br /> <br />Total annual costs <br /> <br />Cost per mg/L of salinity reduction at Imperial Dam <br /> <br />4 <br /> <br />88,600 <br /> <br />7.9 <br /> <br />20 <br /> <br />$17,000,000 <br />4,000,000 <br />2,778,000 <br />$23,778,000 <br /> <br />1,805,000 <br /> <br />105,000 <br /> <br />1,910,000 <br /> <br />$242,000 <br /> <br />002835 <br />