Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />those canals - those that would provide some incremental benefits <br />under the salinity reduction alternative. <br /> <br />Following transmittal of a feasibility report to Congress, and <br /> <br /> <br />authorization of the unit for construction, advance planning studies <br /> <br />will begin. Costs and designs will be refined and operation, maintenance, <br /> <br /> <br />and repayment contracts will be negotiated and signed with the PVID, <br /> <br />Assuming Congress authorized construction of the unit in 1985 following <br /> <br /> <br />detailed feasibility studies, construction could begin in 1989, using <br /> <br /> <br />current procedures and would probably be complete by 1995. Monitoring <br /> <br />of system salt loads would continue throughout advance planning and <br /> <br /> <br />during and after construction to determine effectiveness of the plan. <br /> <br />002804 <br /> <br />3 <br />