My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07426
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07426
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:27:17 PM
Creation date
10/12/2006 2:21:19 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.854
Description
Palo Verde Unit - Colorado Salinity River Control Program
State
CA
Basin
Colorado Mainstem
Date
3/1/1981
Title
Palo Verde Irrigation District Unit Special Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />those canals - those that would provide some incremental benefits <br />under the salinity reduction alternative. <br /> <br />Following transmittal of a feasibility report to Congress, and <br /> <br /> <br />authorization of the unit for construction, advance planning studies <br /> <br />will begin. Costs and designs will be refined and operation, maintenance, <br /> <br /> <br />and repayment contracts will be negotiated and signed with the PVID, <br /> <br />Assuming Congress authorized construction of the unit in 1985 following <br /> <br /> <br />detailed feasibility studies, construction could begin in 1989, using <br /> <br /> <br />current procedures and would probably be complete by 1995. Monitoring <br /> <br />of system salt loads would continue throughout advance planning and <br /> <br /> <br />during and after construction to determine effectiveness of the plan. <br /> <br />002804 <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.