My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07421
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07421
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:27:15 PM
Creation date
10/12/2006 2:21:06 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Rates
Basin
Colorado Mainstem
Date
5/1/1986
Author
USDOE/WAPA
Title
Rio Grande Project Proposed Adjustment of Power Rate
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Additions for the years FY 1984 through FY 1987 were projected <br />in the FY 1983 Revised PRS and in the FY 1985 Final Revised PRS as <br />follows: <br /> <br /> FY 1983 FY 1985 <br />FY Revised Fi na 1 Revi sed <br />Year PRS PRS Difference <br />1984 $179,000 0 ($179,000) <br />1985 70,000 0 ( 70,000) <br />1986 80,000 176,947 96,947 <br />1987 125,000 793,060 668,060 <br /> $454,000 $970,007 $516,007 <br /> <br />Although some additions were completed in FY 1984 and FY 1985, <br />they were not transferred to plant and are shown in the FY 1985 Final <br />Revi sed study as zero. Part of this is projected to be transferred to <br />plant in FY 1986. However, the bulk of the investment is projected to <br />be completed and transferred to plant in FY 1987. The primary reasons <br />for the difference in the two studies are: <br /> <br />Increase in powerplant modifications <br />(includes powerplant automation) <br />Increase in powerplant emergency Sta. service <br />Powerplant personnel safety (new) <br />Other misc. increases and items not previously <br />projected <br />Decrease in Caballo Dam modifications <br />Decrease in Elephant Butte Dam modifications <br />Decrease in reservoir fence <br />Extraordinary O&M capitalized <br />Interest during construction <br /> <br />Total <br /> <br />$151,267 <br /> <br />191,000 <br />80,000 <br /> <br />136,758 <br />(121,865) <br />( 45,840) <br />( 75,000) <br />54,066 <br />145,621 <br /> <br />516,007 <br /> <br />No projections of additions were made in the FY 1983 Revised PRS <br />for FY 1989 and FY 1990 because these years were not within the five <br />year "Window" for projections. Projections in the FY 1985 Final <br />Revised PRS of $26,737, $103,844 anrl $285,357 are made for arlrlitions <br />in yearS FY 1988, 1989, and 1990 respectively. <br /> <br />4. Irrigation Investment. As of FY 1940, power revenues <br />were assigned to repay $3,352,195 of the irrigation investment <br />costs; and these costs increased gradually through FY 1974 to <br />$4,641,359. Repayment of the $3,352,195 is due by FY 2000 which ;s 60 <br />years (50 years plus a 10 year development period) from the initial <br />service date of the RGP. An additional irrigation investment of <br />$138,599 which was incurred between FY 1940 and FY 1950 must also be <br />repaid by FY 2000. The balance of the irrigation investment <br />($1,150,565) is projected to be repaid by FY 2015. <br /> <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.