My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07421
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07421
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:27:15 PM
Creation date
10/12/2006 2:21:06 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Rates
Basin
Colorado Mainstem
Date
5/1/1986
Author
USDOE/WAPA
Title
Rio Grande Project Proposed Adjustment of Power Rate
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />irrigation the cost of a reservoir slightly smaller than Elephant <br />Butte plus the existing cost of all irrigation features, exclusive of <br />storage. Under the priority-of-use method, the total cost of Elephant <br />Butte Reservoir was charged to irrigation since power is incidental <br />and secondary in priority to the use of water for irrigation. The <br />average of the two methods resulted in an allocation of joint costs of <br />20.8 percent to power and 79.2 percent to irrigation. <br /> <br />Beginning in FY 1984 the allocation of joint costs was changed <br />because the water users completed the repayment of their construction <br />costs contract. Power still has the responsibility to repay 20.8 <br />percent of the costs of the Elephant Butte Dam and Reservoir, 100 <br />percent of the Elephant Butte Powerplant and related facilities, but <br />only 40.45 percent of the Caballo Dam and Reservoir. <br /> <br />2. Interest Rates. The interest rate applied to power <br />investments, replacements, and to deficits incurred through FY 1970 <br />was 3 percent. For project investments, replacements, and deficits <br />after FY 1970, the interest rates used were the current rates as <br />required by DOE Order RA-6120.2 and previous Interior Department <br />guidelines as follows: <br /> <br />FY Interest Rate (percent) <br />1971 5.375 <br />1972 5.875 <br />1973 5.5 <br />1974 5.625 <br />1975 6.125 <br />1976 6.625 <br />1977 7.0 <br />1978 7.0 <br />1979 7.5 <br />1980 8.0 <br />1981 8.5 <br />1982 9.0 <br />1983 9.5 <br />1984 10.75 <br />1985 12.375 <br />1986 and thereafter 11.375 <br /> <br />3. Power Investments. The RGP investment reached a high <br />of $10,631,727 before the sale of the transmission lines and <br />substations. The power investment in service as of the end of FY 1985 <br />was $5,819,141 as shown in column 18 of the PRS (Table 2), and is <br />expected to increase to $7,205.091 by FY 1990. Of this amount, the <br />original investment of $2,827,468 has to be repaid by FY 1990. <br /> <br />15 <br /> <br />- . <br />
The URL can be used to link to this page
Your browser does not support the video tag.