My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07411
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07411
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:27:11 PM
Creation date
10/12/2006 2:19:37 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
5930
Description
Flood Protection Section - Flood Events - By Year and Event
State
CO
Basin
Statewide
Date
8/6/1982
Author
Estes Park-Larimer C
Title
Lawn Lake Dam Failure and Fall River Flood - Estes Park and Larimer County Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br /> <br />J31139 <br /> <br />Lead Agency: Town of Estes park/ Federal Emergency.Manage- <br />ment Agency <br /> <br />Financing: Federal Emergency Management Agency <br /> <br />Schedule: Within 10 days <br /> <br />4. Work Element: Relocate, if feasible, the entrance road in <br />the Fall River Mobil~ Horne Village and do <br />not replace the existing damaged bridge. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Background: Fall River Mobile Horne Village was heavily <br />damaged by flood inundation including the loss <br />of approximately 26 mobile homes. A relocation <br />of this entrance road would eliminate a struct- <br />ure across Fall River. (Another existing entrance <br />to the mobile home park is located out of the <br />floodplain). Fall River Village is required <br />by the Town of Estes Park to submit a compre- <br />hensive plan for rehabilitation of the park <br />prior to the issuance of a building permit. <br /> <br />Lead Agency: Town of Estes Park <br /> <br />Financing: Under Investigation <br /> <br />Schedule: On-going <br /> <br />5. Work Element: Promote to the extent possible and practicable, <br />the development of a river front area for the use <br />and pleasure of residents and visitors. <br /> <br />Background: Such an area could function as an effective <br />flood storm drainage detention area, and help <br />to minimize property damage. Its nonstructural <br />development could redeem and improve the econ- <br />omic vitality of Estes Park by providing within <br />its Central Business District a focal point of <br />interest and attraction compatible with the <br />surrounding natural beauty of the Rocky <br />Mountain National Park. <br /> <br />At various times in the past, studies have <br />been done for Estes Park with a focus on im- <br />proving the Town's image and economic vitality. <br />Most of these studies have emphasized the de- <br />velopment of high quality pedestrian areas locat- <br />ed around, and having the effect of "recaptur- <br />ing" the beauty and attractiveness of the <br />Town's rivers. The flood of July 15, 1982 and <br />consequent damages provide a special opportunity <br />to acquire land and flood-prone structures thus <br />enabling the advancement of those studies and <br />plans. <br /> <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.