Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />]01135 <br /> <br />Schedule: Within 30 days <br /> <br />4. W:>rk Elanent: Mitigate the potential problans the flood debris <br />deposited in Rocky fuuntain National Park may <br />cause during high water or future flooding. <br /> <br />Background: A stlrly should be made to determine the extent <br />and degree of tOO hazard posed by logs and other <br />debris deposited wi thin tOO Fall River drainage <br />in Rocky fuuntain National Park. Any rerroval must <br />be accanplished in a manner that will preserve the <br />natural resources of the park. <br /> <br />Lead Agency: National Park Service with CXJOperating agencies <br /> <br />Financing: None currently available <br /> <br />Schedule: 90 days <br /> <br />12 <br />