Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />'I <br />I <br />I <br />I <br />I <br /> <br />: <br /> <br />II <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />{Ju1131 <br /> <br />A. <br /> <br />Identification and Regulation <br /> <br />1. <br /> <br />Work Elarent: <br /> <br />Background : <br /> <br />Lead Agency: <br /> <br />Financing: <br /> <br />Schedule: <br /> <br />2. <br /> <br />Work Elarent: <br /> <br />Background : <br /> <br />Lead Agency: <br /> <br />Financing: <br /> <br />Schedule: <br /> <br />3. <br /> <br />Work Element: <br /> <br />Background: <br /> <br />Lead Agency: <br /> <br />Investigate and report on the need for a flood <br />insurance resttrly of the Fall River. The in- <br />vestigation should include a hydrologic and hy- <br />draulic analysis of the area of the Fall River <br />\\est fram the confluence of Big Thanpson and <br />Fall River, through Estes Park, to the National <br />Park Ibundary. This study should include Larimer <br />County unincorjXlrated areas and the Ta-m of <br />Estes Park. <br /> <br />The flON vel=ity of t-l1e Fall River caused cross- <br />sections of the stream to change dramatically. In <br />addition silting in of tre channel has ==ctl. <br />in many places. A restudy of the Fall River <br />v.ould ac=ately display the 10Q-year floodplain. <br />An updated map would aid l=al officials in <br />future planning along the Fall River. <br /> <br />Federal Energency Managarent Agency. <br /> <br />Federal Ehe~ency Management Agency. <br /> <br />Report o::.rnpleted within 30 days. <br /> <br />Provide guidance on floodproofing of buildings <br />and dwellings that in=ed major damage in the <br />Town of Estes Park and Larimer County. <br /> <br />Replacerrent of buildings and structures in <br />the 10Q-year floodplain will be required to <br />conform to both the Larimer County and Town <br />of Estes Park floodplain management resolutions <br />and ordinances. <br /> <br />Federal Energency Managerrent Agency <br /> <br />None required <br /> <br />On-going <br /> <br />Develop minim.nn design and construction standards <br />for the replacarent of privately CMned bridges. <br /> <br />The same action was initiated by Larimer County <br />after the Big Thanpson flood disaster of 1976. <br />Standard design fonnats allow for economies of <br />scale and streamline the biddim pr=ess. As <br />a result, the approach is attractive to the <br />private businesses and horre owners involved. <br /> <br />Ta-m of Estes Park and Larimer County <br /> <br />8 <br />