Laserfiche WebLink
<br /> <br />-" <br />. ..... <br />.1. v:..... <br /> <br />" <br /> <br />".:TROI.OI.ITA..... W.-\Tf.R IHoSTNICT <br /> <br />610,000,000 kwhr fllm and 75,000,000 kwhr secondary. The out- <br />put of this plant will be approximately 50 per cent ~~Teater than <br />that of the Parker power plant, due principally to the difference <br />in head. <br />It is anticipated that this power plaut will be connected to the <br />District's transmission s~'stem under the provisions of the Boulder <br />power contracts of 19-11, applying to the integration of operations <br />of certain Gowrnmeut pl.lIlts on the Colorado River. <br /> <br /> <br />Par1.:l'r Dam and ]JO!f"('r pltl1lt trom the Arizona bank <br /> <br />