Laserfiche WebLink
<br />f. <br />I <br /> <br /> <br />; <br /> <br />tr <br /> <br />. .- ~. - <br />':'vl~ <br /> <br />MAIN AQUEDUCT <br /> <br />21 <br /> <br />qui red to file a detailed personal history statement, and was pro- <br />vided with an identifying pass bearing his photograph and thumb <br />print. Fences were built inclosing each plant and electrically <br />operated gates were installed to control entrance to the inclosures, <br />Each station chief was deputized by the sheriff of the county in <br />which his plant is located, <br />Construction work on the pomping system included the installa- <br />tion of lightning arresters in the 230 kv switch yards, emergency <br />75 kilowatt gas-engine generating sets at all plants, auxiliars' camp <br />water supply pumps at Gene, Iron, Eagle, and Hayfield, and seven <br />4-room cottages at Gene, Five cottages were moved from locations <br />in various construction camps and }'econditioned for permanent <br />use, The number of cottages on the pomping system is now, Gene <br />32, Iron Mountain 18, Eagle 12, Hayfield 10; total 72, All con- <br />struction work was pnictically completed at the end of the fiscal <br />year, <br />The cost of the five pumping plants, including construction, <br />equipment, permanent quarters for the operating forces, fencing <br />of the grounds and testing, on June 30, 1941 is $15,843,538.60, <br /> <br /> <br />Reconditioned cottages at Hayfield <br />