My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07404
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07404
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:27:09 PM
Creation date
10/12/2006 2:18:56 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
12/1/1965
Author
Unknown
Title
Draft - How California Plans Water Development - Report of the Coordinated Planning Subcommittee - December 1965
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />002431 <br /> <br />. <br /> <br />. <br /> <br /> <br />Work on (al and (bl is performed by the Area Management organizations <br />with overall guidance by the Statewide Plal}nirig Office. <br /> <br />Activities under (c) are performed in the Statewide Planning Office, with <br />the Area Management and the Statewide Operations office participating <br />through their interrelated programs. <br /> <br />Here is a br ief descr ipt ion of each of the three phases with subject list- <br />ing of major activities: <br /> <br />(a) Basic Information Phas e - - Pevelops fundamental knowledge of land <br />use, land classification, crop adaptability, and present water use for <br />the subsequent determination of an area's future water requ irements, <br />surplus, or deficiency. <br /> <br />Land Use Inventories <br />Present Land and Water Use Reports <br />West Side Crop Adaptability Study <br /> <br />(b) Evaluation Phase -- Utilizes and builds upon the bas in information <br />developed in the previous phas e to determine the quantity and quality of <br />the water resources (both surface and ground) and the buildup of water <br />requirements in each of the watersheds of the State. <br /> <br />Water Resources and Future Water Requirements <br /> <br />(In estimating future water requirements, these major pro- <br />cedures are involved: (1) crop market outlook studies to <br />enable l' eallst ic projections of futu re crop patterns" (2) pro- <br />jections of future land us e, (3) evaluation of payment capacity <br />based on ability to pay for water, and (4) projections of <br />future economic demands for water. ) <br /> <br />(c) Integrated Project Planning Phase -- Integrates all studies previously <br />descdbed and formulates the most favorable economic sequence and <br />chronology of project development tom e e t' growing needs throughout <br />the State. The following activities are carried out in this phas e of the <br />program: <br /> <br />,Project Staging <br />Regional Planning and Evaluation and Interagency Coordination <br />Progres s Report on California Water Plan <br /> <br />>:< >:< * >:{ * <br /> <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.