My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07393
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07393
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:05:23 PM
Creation date
10/12/2006 2:18:20 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence-Federal Agencies
Date
4/8/1949
Author
BOR
Title
DOI BOR Region 4 Regional Planning Engineer's Monthly Progress Reports
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />, <br /> <br />work, both field find office, w~s completed in the lower Gunnison Bosin <br />b0low Deltu, Colorado. Some field work still rem~ining in the Cedcredge <br />area has been delayed by severe winter weather. <br /> <br />Grond i'tesa Project, Colorado <br /> <br />Field surveys on the Pump C~ncl Qnd the Fruitgrowers Feeder C~n~l <br />were continu~d. Strip topography along the route of the former we',s oom- <br />pleted und vertical control clong the route of tr,e feeder cQn,,1 WQS <br />estc.blishcd. <br /> <br />lmnnesoto Project, Colorado <br /> <br />The project report was revised by the area office. Changes were made <br />in aocordance with cor~nents received conoerning the original pr811min~ry <br />druft of the report. The r'''payment analyses, cost ~lloc"tions. and esti- <br />mated construction costs were also revised to correlcte more closely with <br />other projects being considered for assistance fron potentiul power <br />revenues from the Colorado River Storege Project. <br /> <br />Garfield Pumping Division-G~and Valley Project, ColoradO <br /> <br />Preliminary dasigns and estimates on pumping plants hove been completed <br />by the area office. Prelimin~ry designs of laterals and l~teral structures <br />will be ccropleted by March 1. <br /> <br />Florida "roject, Colorado <br /> <br />A fin"l study of thc over-all bencfits ~nd costs, based on the latcst <br />prescribed procedure wes completed along with tha Agriculturel Economy <br />Appendix for the project report. The Arca Office revision of the draft <br />of the project report and copies of thG revised appendices forwarded to <br />the Regional Office. <br /> <br />San Mi[';uel Proj~,ct. ColoradO <br /> <br />Inclement weether and snow cover prevented lend classification field <br />work except for 3 duys during the month. A total of 246 soil samples hilS <br />becn analyzod. waps 00 which the field work is complete wero checked. <br />boundaries mutched, inked, and colored. <br /> <br />Animas-La Pluta Project, Colorado-N8w Moxico <br /> <br />The Overall Ben0fits and Costs Appendix of the project report has boon <br />completely revi sed in accordance with the lute st prescribed procedure. <br />This appendix is in rough draft form r2quiring typing and checking before <br />it is oomplete. Ferm budget work sheets huve been checl'ed, typed und <br />inserted in the Agricultural Economy Appendix. The field draft of the <br />project report for the La PInta Units will be cOJilpleted about Mc.rch 15, <br />1949. <br />/) , <br />/:.-;:'<-.~t.. /j_<- /'. ""V"\ '.' "1. '../ <br />,J <br /> <br />~0 <br />~c.9 <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.