My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07393
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07393
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:05:23 PM
Creation date
10/12/2006 2:18:20 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence-Federal Agencies
Date
4/8/1949
Author
BOR
Title
DOI BOR Region 4 Regional Planning Engineer's Monthly Progress Reports
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />~ <br /> <br />water supply resulted in slight reV1s~ons in power operntion <br />studies. Suoh revised studies were pbrtially completed. <br />Chunges in hydrolocic studies nnd powor studies noted above were <br />incorporated into the substQntiating report. Considerable pro- <br />gress '''''-6 ",:.de in preparf\tion of report '2,pper,dices. <br /> <br />Cross iJount:tin Unit. Colorado <br /> <br />Tho ~nit0-Yllmpll Diversion topogr&phy maps were prepared. <br />Revi sions were made to modified hi stori onl flow computnti OIlS <br />and to esti~ted ultimute flow. Minor revisions to power <br />studies were m~de due to changes in estimated water supply. <br /> <br />Glen Canyoll Unit, 'Arizon!1-Utah <br /> <br />The estimated virgin runoff of the Colorado River at Lees <br />Ferry was revised to conform with comments by the Chief, Hydrology <br />Division. Corresponding revisions were also made to modified <br />historical flow ccmputations and to ultimate flows previously <br />computed. Revisions to power studies m~de necessary by revi- <br />sions to computed water supply were c"lcul(lted. h.yout schedules <br />for the 'Glen Canyon Unit in conjuncti on wi th othar upper bc,sin <br />~ower sites were computed. <br /> <br />Coloredo River Above Grund Juncticn, Color"do <br /> <br />All work under Engineering Plan, Designs and Estimotes progressed <br />uniformly during tire month. Work on the !louring Fork Hiver wos not on <br />schedule dUG to the injection of ~dditionol problems of wuter supply und <br />requirements for industriul uses. Extensive areus south of the Color~do <br />River betweetl GlenvlOod Springs und DeBeque h9ve bean inoludo;! und m"y be <br />affecte;! by the Roaring Fork studies. <br /> <br />Smith Fork Project, Colorado <br /> <br />The processing of field date on the Smith Fork Feeder and Aspen <br />cutl(ds Wo.$ continued and studies of !llternlltivc routes oOl'lplcted on the <br />first four miles of the Aspen C"m<l', by the area office. Prdininc.ry <br />designs end estilMtes are 15 perCEJ/lt complete on each canal. Pr~limin"ry <br />designs and estimntes on Gruwford Dum Ure being prepured by the Regional <br />Offie,e. Advunce discharge racords on Iron Creek ('nd Smith "ark River <br />were received during the month l'\uking it possible to continue .."ter supply <br />studies at a more r~pid rote. Consumptive use. water requirement, and <br />operation studies were Hlso advanced. Economic studies were somewhat <br />ret~rded during the month becaus~ of delays in the hydrologic sUldies. <br />Work was continued on studies of the present and anticipdted economy on <br />the project. A rough dr~ft of the Land Resources Appendix hes boen <br />prepared. <br /> <br />~ <br />u> <br />o <br /> <br />Gunnison River Project, Colorado <br /> <br />ReconnaissQnce geological inspection w~s made of tho Ridgeway Damsite <br />on the Uncompahgre River by the Regional Geologist. Le.nd classification <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.