Laserfiche WebLink
<br />[41 <br />\ <br /> <br />::&- a IK-h ~#/ ~"'. <br /> <br />-2- <br /> <br />Colorado River Storaee Project, Colorado-New kex~co-Utah4Iyomin~ <br /> <br />#TIork continu~d on the assembling of data and the drafting of the appendix <br />on designs and estimates. Data on in-basin and transmountain depletions and the <br />associated present modified and ultimate streamflows were revised. Combined <br />operation studies for initial and ultimate conditions were revised. A volume oJ <br />supportil1~ data presenting latest information on past, present, potentiai, and <br />future ultimate transmountain diversions from" the Colorado River basin was com~ <br />pleted."l) Hydrologic and reservoir operation data were fOI'l"larded to the Federal.' <br />Po~er Commission, the Fish and TIildlife Service, and the National Park Service <br />in order to furnish them information on which to base their comments to be <br />,resented in the Interim Project Report. Data on combined energy generation <br />under initial and ultimate conditions of stream flow were revised. Energy gener- <br />ation at Martinez reservoir under "lresent-modified flow conditions was revised <br />a~d a study of energy generation under ultimate conditions was made. A field <br />draft of the Regional Director's report was submitted to the Re[;ional Office for <br />,',"view. Revisions to the substantiating portion of the Interim Report and the <br />~ssembling of the appendices on water supply and designs and estimates were con- <br />~:.nued. <br /> <br />Green Division, Colorado-Utah~iyomin~ <br /> <br />Flamin~or~~~~i~. freparation of maps of the Ashley Dam site <br />area was continued and is about 90 percent complete. <br /> <br />Echo Park Unit. Hydrologic and reservoir operation date. were <br />prepared and fOI~~lrJed to the National Park Service. <br /> <br />Gunnison Division, Colorado. Data on inbasin and transmountain depletions <br />and the associated present modified and ultimate stream flmvs were revised. <br />Power studies in connection with the combined operation were made. <br /> <br />Curecanti Unit. Testing and anal;yses of construction materials <br />have been completed at the Paonia Laboratory. <br /> <br />Austin Unit. Foundation drilling was completed and cleanup work <br />is being accomplished. <br /> <br />Middle River Division, Arizona-Utah <br /> <br />~ <br />01 Glen Canyon Unit. Power studies in connection with the combined <br />~ operation were continued. Preparation of the discussion of cost esti- <br />~ mates was continued for inclusion in the appendix on designs and <br />estimates. <br /> <br />Yampa River Project, Colorado-Utah-Wyoming <br /> <br />Savery and Pot Hook Units. Topography and tailwater surveys were started <br />on First I!esa canal diversionsite and carried to 20 percent completion. Tail- <br />water studies for Savery daw site were completed, Designs and esti=tes for <br /> <br />I <br /> <br />. ~ <br />