Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Collbran Project, Colorado <br /> <br />The r€VlSlon of tbe financial section was completed in the Regional <br />Office and the final project report was submitted to the Commissioner. <br /> <br />Silt Project, Colorado <br /> <br />Desi~ls ~nd estimates for Davies ditch and Grass Valley ditch were <br />continued. Sedimentation studies for Rifle Gap reservoir were initiated <br />and carried to 30 percent completion. <br /> <br />San Miguel Project, Colorado <br /> <br />Topographic surveys were completed on the Canyon and Gurley reservoir <br />sites. The ["ail Box Park cP.nal line traverse and level control for the <br />Gypsum Valley canal were each extended 8 miles. Field work on the classi- <br />fication of project lands was completed. <br /> <br />/' <br />.~'j /( <br />1\ ~" - >,-01. 'vJA-....-lA-. <br />? <br /> <br />~ <br />Cf)' <br />o <br /><..0 <br /> <br />3 <br />