My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07393
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07393
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:05:23 PM
Creation date
10/12/2006 2:18:20 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence-Federal Agencies
Date
4/8/1949
Author
BOR
Title
DOI BOR Region 4 Regional Planning Engineer's Monthly Progress Reports
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />UNITED STATES <br />DEPARTMENT OF THE INTERIOR <br />BUREAU OF RECLAMATION <br />Region 4 <br />Post Office Box 360 <br />Salt Lake City 8, Utah <br /> <br />December 13. 1949 <br /> <br />This report summarizes progress made on investigations inColorado <br />during November 1949. <br /> <br />(1) Progress of Investigations <br /> <br />(a) New investigations proposed: None <br />(b) Revision of current program: None <br />(c) Progress of current.investigations (detail listing follows): <br /> <br />Colorado River Storage Pro,ject, Colorado-New Mexico-Utah-Wyoming <br /> <br />A cost estimate study was initiated for Martinez Unit on the San Juan <br />River and cost estimate studies were continued on ot.her units. A report <br />waS prepared showing long-time average sediment flow passing key gages <br />in the Upper Colorado River Basin1 vlater supply studies for Martinez <br />reservoir were completed showing historical, present modified, and ulti- <br />mate flow and evaporations were determined. Preliminary estimate of power <br />production was made for Martinez reservoir under two alternate plans./ <br /> <br />Green Division, Colorado-Utah-Wyoming <br /> <br />.~ <br /> <br />Flaming Gorge Unit. Preparation of the maps of the Ashley <br />dam site area was continued and is about 80 percent complete. <br />Diamond drilling operations continued at the Ashley dam site. <br /> <br />Echo Park Unit. Studies were made in cQoperation with <br />the National Park Service to show justification of the present <br />location of Echo Park reservoir. Studies on alternative sites <br />for Echo Park reservoir were carried on including a cost estimate <br />of the Ladore site. <br /> <br />Split Mountain Unit. Revision of the cost estimate. for <br />Split Mountain dam was made to show change in costs due to <br />tunnel relocation. <br /> <br />Gunnison Division, Colorado. Studies were continued to determine <br />a feasible and economical plan of hydroelectric development on the <br />Gunnison River for inclusion in the interim project reports. <br /> <br />;- <br />'6' <br />.' <br />o <br />
The URL can be used to link to this page
Your browser does not support the video tag.