My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07376
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07376
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:27:00 PM
Creation date
10/12/2006 2:18:11 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8278.100
Description
Title I - Yuma Desalting Plant
Basin
Colorado Mainstem
Date
8/1/1988
Author
USDOI/BOR
Title
Operation and Maintenance Funding for the Yuma Desalting Plant, Draft Special Report
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />power and there would be shutdowns with a canbined duration of 6 hours per <br /> <br /> <br />day. Reject stream requirem;mts would be 55,000 acre-feet annually. <br /> <br />Advantages: <br /> <br />o Saves 70 to 80 percent of power during peak hours. <br /> <br />o Reduces power costs IOOre than either alternative A-lor A-2. <br /> <br />Disadvantages: <br /> <br />In ad::li.tion to the alternatives discussed for alternatives A-l and A-2 it <br /> <br />has the following ad::Iitional disadvantage: <br />o Nonfinn power interruptions duriIlg peak hours could be IOOre <br /> <br />significant than strictly a peak power interruption. <br /> <br />Status: Until a souroe for reject stream replacarent can be deteonined <br /> <br />this altemative will be "put on hold" since it increases the quant:ity of <br /> <br />water required for reject stream replaClE!!l"ellt. <br /> <br />A4. Install state-of-The-Art Low-pressure Membranes <br /> <br />~}If; <br />~~ <br /> <br />The YDP would use newly developed, low pressure, thin-film c:crlpOsite <br /> <br />rreroranes installed in place of the high-pressure rreroranes now designed <br /> <br />for the plant. These rreroranes would reduce desalting equipnent power <br /> <br /> <br />danand by about 40 percent and thereby reduce total YDP power danand by <br /> <br />about 20 percent. The new rnent>ranes would require testing. M::>dification <br /> <br />to the pretreatrrent facility could be required. The estimated annual O&M <br /> <br />costs, including the annualized capital cost of the low-pressure membranes <br /> <br />would be about $25.8 million. Potential savings anticipated would be $1.5 <br /> <br />DD<f;:~J;f\,~~ :,~n rr',l <br />~ ~.\ ::.~~ \. :'~ ::"~1:: ~ ~\j i~'A}\ \ <br /> <br />,?" = 0l <br />.." ? <br />...~ ;'.. ~. i . <br /> <br />.~.. i~ :~r <br />',. 'L ! <br /> <br />o:?('"; <br />:.J.. . <br />'E 1_ .: <br />II '~..3 <br /> <br />:....~ ;~;. :J <br />f\~ \-~ :.J <br /> <br />f' ~n~~ <br />") .. <l \0' <br />...;' I';..j I ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.