Laserfiche WebLink
<br />336"0'" <br /> <br />On May 6, 2003, lID sought clarification of the remand order. The Court, on May 13, <br />2003, ruled that the remand order did not determine certain issues raised in lID v, US, <br />The Court then renewed its instruction to complete the de /lOVO Part 417 review, <br /> <br />B. SUMMARY OF PERTINENT PROVISIONS OF 43 C.F.R. PART 417 <br /> <br />Part 417 provides that the Regional Director or his representative will arrange for and <br />conduct such consultations with a Colorado River water contractor as he deems <br />appropriate in order to make recommendations relating to water conservation Illeasures <br />and operating practices in the diversion, delivery, distribution and use of Colorado River <br />water, and in order to make an annual determination of the water contractor's estimated <br />water requirements (PaI1417.2). <br /> <br />The recommendations and determinations are for the purpose of ensuring that deliveries <br />of Colorado River water to the contractor will not exceed those reasonably required for <br />beneficial use under the contractor's water delivery contract with the Secretary of the <br />Interior (Part 417.2), <br /> <br />The recommendations and determination are to be based upon, but not necessarily limited <br />to such factors as are set forth in Part 4]7,3: <br /> <br />. Area to be Irrigated <br />. Climatic Conditions <br />. Location <br />. Land Classifications <br />. Kinds of Crops <br />. Cropping Practices <br />. Type of lrrigation System in Use <br />. Condition of Water Carriage and Distribution Facilities <br />. Record of Water Orders <br />. Rejections of Ordered Water <br />. General Operating Practices <br />. Operating Efticiencies <br />. Methods of lrrigation of the Water Users <br />. Amount and Rate of Retum Flows to the River <br />. Municipal Water Requirements <br />. Pertinent Provisions oflhe Contractor's Boulder Canyon Project Act Water <br />Delivery Contract <br /> <br />The Regional Director is to provide written notice of }lis recommendations and <br />determinations to the water contractor. If the recommendations and determinations <br /> <br />July 2, 2003 <br /> <br />9 <br /> <br />Detemlinations and Recolllmendatio'1< <br />For lID - Calendar Yea, 2003 <br />