Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />1. 't '; i <br /> <br />South Side 6,359 <br />Victor Florez 22 <br />EI Moro 160 <br />Model 6,177 <br />Johns Flood 1,854 <br />Hoehne 1,742 <br />Bums & Duncan 322 <br />Lewelling-McCormick 378 <br />SIDas -1Ql <br />19,717 <br /> <br />1/ Includes Baca Ditch <br />Picketwire-Chicosa <br />Lujan <br />Northside <br />EI Moro <br /> <br />tl. Hyd~logic Operations \ <br />, <br /> <br />5,566 <br />o <br />156 <br />7,079 <br />1,722 <br />1,618 <br />174 <br />389 <br />---2J. <br />19,385 <br /> <br />5236.8 <br />o <br />154.6 <br />6804.9 <br />2085,8 <br />1200.0 <br />88.4 <br />417.1 <br />61,8 <br />19395.0 <br /> <br />5296.0 <br />o <br />154.6 <br />6804.9 <br />2085.8 <br />1202.7 <br />88.4 <br />417.1 <br />61,8 <br />19318.0 <br /> <br />324 <br />632 <br />908 <br />266 <br />385 <br />2,516 <br /> <br />311.5 <br />2805.8 <br /> <br />311.4 <br />2667.0 <br /> <br />3117.3 <br /> <br />2978.4 <br /> <br />The hydrological operations of the Project have been reviewed for the 10 year period <br /> <br />- <br /> <br />1985 through 1994 State of Colorado water years, to determine the effect the operation has had <br /> <br />on other Colorado and Kansas water users and to amend the operating principles if necessary in <br /> <br />accordance with Condition NO.4 of Kansas five conditions for approval of the operating <br /> <br />principles. The review also serves as a review in accordance with Article VI of the Operating <br /> <br />Principles with a primary goal of obtaining optimum beneficial use of the water supply as <br /> <br />.' <br />conditions change, operating experience is gained, and more technicID data become available. The <br /> <br />transferred Model Storage Rights Decree provides that the effects of Project operation on <br /> <br />downstream water users shall be evaluated at the Thatcher gauge by requiring that the historic <br />~ <br /> <br />flows at this gauge shall not be depleted by Project operations. <br /> <br />~.~ <br />~ <br />~ <br />~ '-<vrelJ.-- <br /> <br />~ublished records are available for the Trinidad gauge, which is on the Purgatoire River <br /> <br />just upstream of the first Project diversion and the Thatcher gauge which is downstream of the <br /> <br />21 <br />