My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07352
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07352
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:54 PM
Creation date
10/12/2006 2:16:16 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8143.700
Description
John Martin Reservoir - Annual Operating Plans and Reports
State
CO
Basin
Arkansas
Water Division
2
Date
11/1/1990
Title
Annual Report of the Operations Secretary Concerning the Operation of John Martin Reservoir - 1990 - Part 1 of 2
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ROY ROMER <br />Governor <br /> <br /> <br />JERIS A DANIELSON <br />Slate Engineer <br /> <br />(:) <br />(:~) <br />... <br />c') <br />t1' <br />W <br /> <br />DIVISION OF WATER RESOURCES <br />WATER DIVISION" <br /> <br />Sleven J. Wille <br />Division Engineer <br />219 W. 5th Street, Room 223 <br />P,O, 80x 5728 <br />Pueblo, Colorado 81003 <br />(719) 542.3368 <br /> <br />December 18, 1989 <br /> <br />Mr. 'Thomas L. Shinn <br />P. ,0. Box 390 <br />Lamar. CO 81052 <br /> <br />Subject: <br /> <br />Response to your letter dated 12/8/89 - City of <br />Lamar's use of clohn Martin Reservoir to regulate <br />releases of Frying P~n Arkansas Water <br /> <br />') <br /> <br />Deilr Mr. Sl.d nn: <br /> <br />I have been directed to write to you by the Arkansas River Compact <br />Administration, acting as its Operations Secretary. to advise YOU of <br />the Administration's action on your request. <br /> <br />It is the Administration's position that henceforth should the City <br />of LanJar desire to utilize ,John Nartin Reservoir in a manner similar <br />to that which occurred during 19.89, the following procedure is to be <br />followed to secure the Administration's approval. <br /> <br />.:-.' <br /> <br />Three weeks prior to the initiation of any operation which requires <br />the utilization of John Martin Reservoir as a regulating device, the <br />City shall provide written notice of its intent detailing the <br />specific terms of the proposed operation to the Operations <br />Secretary, These terms should include: the total volume, source, <br />and intended use of water to be regulated: the nomirial rate of <br />inflow to John Martin; (i.e., rate of release from Pueblo) the <br />rpc'll.It);-:;tc:"d I lite ()[ lol"'_":1:30 fl'()1Jl ,JUJlfl Mdt l,ill; the required point of <br />delivery; the proposed date of initiation; and the approximate <br />duration of the operation. The Operations Secretary is to forward <br />said notice to the Administration, The Ci ty and. the Operations <br />/ Secretary shall consider the Administration's approval to have been <br />granted unless objection is received from either or both of the <br />States comprising the Administration, by the Operations Secretary <br />within the three week notice period. <br /> <br />. ~} <br /> <br />'C"",, <br />r~ <br /> <br />,..,) <br />t,~ <br /> <br /> <br />:~ .i <br /> <br />It is the Administration's understanding that such regulation <br />operatons shall be subject to appropriate evaporation and <br />transportation losses as the prevailing conditions may warrant as <br /> <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.