My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07343
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07343
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:51 PM
Creation date
10/12/2006 2:16:02 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8149.100
Description
Miscellaneous Small Projects and Project Studies - NRCS-Ft Lyon Canal Co Limsetone Graveyard Creeks
State
CO
Basin
Arkansas
Water Division
2
Date
10/2/1992
Author
CWCB
Title
Plan of Study and Request For Proposal Ft Lyon Canal Company Water Transfer Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />lGl'l <br /> <br />DELIVERABLES <br /> <br />The firm shall provide the specified number of copies of the following items: <br /> <br />. Draft Task Reports as each task is completed (10). <br />. Phase I Draft Preliminary Report (25). <br />. Phase I Final Preliminary Report (25). <br />. Draft Study Report (25). <br />. Final Study Report (50). <br />. Technical Appendices (3), containing: <br />Copy of any previous report relied upon and/or cited in any task or study report <br />prepared as part of this study, if the CWCB does not already have a copy. <br />All technical analyses, calculations, and computer runs conducted as part of this <br />study. <br /> <br />. One reproducible original master copy of the Final Preliminary and the Final Study <br />Reports. <br /> <br />PERSONNEL OUALIFICATIONS AND RELEVANT EXPERIENCE <br /> <br />Provide brief resumes for personnel scheduled to work on this project. Include a brief <br />description of only those projects the person has been involved with that are relevant to this <br />study. This information shall be a ~ summary of the information previously provided in <br />the SOQ. Extensive lists of projects and publications not relevant to this project are <br />discouraged and may not be given consideration by evaluators. <br /> <br />PROJECT MANAGEMENT /ORGANIZATION <br /> <br />The roles of the Project Manager and p~rsonnel assigned to this project should be <br />presented in a organization chart and brief narrative form. In the narrative section provide <br />time availability and pertinent project organizational skills, as well as team organization if <br />subcontractors are utilized. <br /> <br />An important part of this close coordination between the Project <br />Manager, the CWCB staff, an other interested r During the course of the study, the <br />consultant shall make frequent co ac Wlt the CWCB staff regarding the status of progress <br />in addition to providing the previously listed task and study reports. Procedures for <br />identification of any problems anticipated or that may occur during the study should be <br />addressed. Close coordination with other ongoing Arkansas Valley~s will be required <br />to avoid duplication of effort and facilitate exchanges of informaikm....--) <br /> <br />\ <br />~ <br />6 rr~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.