My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07325
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:47 PM
Creation date
10/12/2006 2:15:50 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.600
Description
Narrows Unit - Studies
State
CO
Basin
South Platte
Water Division
1
Date
6/17/1977
Author
Dames And Moore
Title
Proposal Safety review of Foundation and Embankment Narrows Dam, South Platte River Fort Mortan, Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />DAMES B MOORE <br /> <br />Mr. Felix L. Sparks <br />June 17, 1977 <br />Page 2 <br /> <br />The team is composed of senior Dames & Moore personnel with many years <br /> <br /> <br />of experience in dam design, geology, soil mechanics and seismicity. <br /> <br /> <br />Our personnel will be augmented by two outstanding consultants. <br /> <br /> <br />Mr. Thomas Leps has performed many dam safety reviews, been on consulting <br /> <br /> <br />boards for many large dam projects and was a member of the Teton Dam <br /> <br /> <br />Independent Review Panel. Mr. Harry Cedergren also has extensive experience <br /> <br /> <br />in earth dam design and literally "wrote the book" on seepage analysis. The <br /> <br /> <br />proposed approach was used in performing the Narrows Flood Study with very <br /> <br /> <br />good results. <br /> <br />.-, <br /> <br />OBJECTIVE OF STUDY <br /> <br />On the basis of the information you have given us, the discussion held <br /> <br /> <br />in your office, and the problems involved, we understand the objectives of <br /> <br /> <br />this study to be as follows: <br /> <br />1. To review and evaluate the Bureau of Reclamation's (USBR) <br />data and studies on the foundations and preliminary <br />embankment designs of the proposed Narrows dam, with <br />particular emphasis on conditions at the right abutment. <br /> <br />2. To review and interpret the USBR's "Independent Panel of <br />Experts" report On the proposed Narrows dam. <br /> <br />3. To give our professional opinion, based on the review and <br />evaluation of 1. and 2. above as to whether... <br /> <br />a. the foundation of the proposed Narrm,s dam will <br />safely withstand the contemplated loads and forces. <br /> <br />b. there are suitable construction materials available <br />of sufficient quality and quantity to build the <br />proposed embankment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.