My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07320
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07320
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:47 PM
Creation date
10/12/2006 2:15:35 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.10
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects- Aquatrain
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
8/1/1983
Title
Monthly Progress Report - Aquatrain Project - August 1983
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />~ <br />:""..,. <br /> <br />~. -~, <br />.....t. <br /> <br />5.3 ANTICIPATED OCTOBER EVENTS <br /> <br />..~ <br />(..) <br />(. '. <br />.j <br /> <br />Determine how to schedule and track batches of commodities from <br />numerous sources in varying amounts to delivery points in an <br />integrated pipeline system. <br /> <br />6.0 SUBTEAM: ENVIRONMENT/CORRIDOR/FEDERAL PERMITTING/ <br />ENERGY MANAGEMENT (Fite) <br />6.1 AUGUST EVENTS <br /> <br />Draft of Corridor Study Report completed by BLM and distributed <br />to Federal agencies for review and comment. <br /> <br />Conducted a three-day field trip of the Stage I area in <br />Utah for all interested Federal agencies. Purpose of the <br />trip was to become familiar with the five possible corridors <br />from the Emery-Price area to Intermountain Power Project <br />near Delta, Utah. The group met with Forest Service representatives <br />to discuss potential corridors. <br /> <br />Draft of Work Order No. 2 for preparation of Project EIS <br />by BLM under Interagency Agreement No. 3-AA-40-00590 completed. <br /> <br />Work continued on Forest Service/Reclamation Memorandum <br />of Understanding. <br /> <br />6.2 ANTICIPATED SEPTEMBER EVENTS <br /> <br />Forest Service/Reclamation Memorandum of Understanding signed. <br />Work Order No. 2 for preparation of EIS by BLM signed. <br />Preliminary report on Stages I, II, and III of the Project <br />completed. <br /> <br />Prepare statement of work for Future Energy Demand Study. <br /> <br />Prepare draft of Working Agreement to Cooperative Agreement <br />between Aquatrain, Inc. and the BUreau of Reclamation which <br />defines funding and responsibilities for EIS preparation. <br /> <br />6.3 ANTICIPATED OCTOBER EVENTS <br /> <br />Corridor Study Report completed and submitted to Reclamation <br />by BLM. <br /> <br />Sign Working Agreement to Reclamation/Aquatrain, Inc. Cooperative <br />Agreement which defines funding and responsibilities for <br />EIS preparation. <br /> <br />Prepare project description for EIS. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.