Laserfiche WebLink
<br />Table 2. Estimated Construction Costs - Plan 1 <br /> <br />Reconnaissance <br /> <br /> Unit Quantity Unit Cost TotaJ. Cost <br />CBAt'WEL <br />Channel excavation cy 1,100,000 0.20 220,000 <br />Stripping for embankment cy 15,000 0.05 750 <br />Excs;v'ation, drains and misc. cy 5,000 0.40 2,000 <br />Excavation, borrow for embankment cy 70,000 0.20 14,000 <br />Compacting embankment cy 40,000 0.25 10,000 <br />Overhaul Sta. cy 650,000 0.0l!- 26,000 <br />l"ence mi. 21 800.00 16,800 <br />Highway 17 culvert ea. 1 18,000.00 18,000 <br />Railroad culvert ea. 1 18,700.00 18,700 <br />County and farm bridges ea. 5 5,000.00 25,000 <br />Inlet control structure ea. 1 2,500.00 2,500 <br />Outlet control structure ea. 1 2,000.00 2,000 <br />Right-uf'-way Acres 135 50.00 6,750 <br />Right-of-way Acres 135 300.00. 40,500 <br />SubtotaJ. 403,000 <br />Contingencies - 25% + 97,000 <br />Field Cost 500,000 <br /> <br />PUMPING PLANrS NO. 1 AND 2 <br /> <br />Each plant, Q = 125 cfs <br />and h = 27 feet <br /> <br />Substructure <br />Superstructure <br />Pumps and motors <br />ElectricaJ. equipment <br />Plant equipment <br />Subtotal <br />Contingencies - 25% ~ <br />Field Costs <br />Plants 1 and 2 Field Cost <br /> <br />La <br />Ls <br />Ls <br />Ls <br />Ls <br /> <br />Ls <br />Ls <br />Ls <br />Ls <br />Ls <br /> <br />45,000 <br />17,000 <br />64,000 <br />22,000 <br />14,000 <br />162,000 <br />38,000 <br />200,000 <br /> <br />400,000 <br /> <br />r ~ '" .'.' ., <br />-j..... ~~L.l '_ U <br /> <br />6 <br />