Laserfiche WebLink
<br />Table 5. EstilIla.ted Construction Costs - Plan 4 <br /> <br /> Unit Quantity $/Unit Total Cost <br />PUMPING PLANT NO. 4 <br />Hotors and pumps Ls Ls Ls $100,000 <br />Building Ls Ls Ls 140,000 <br />Piping and valves La Ls Ls 90,000 <br />Surge equipment Ls Ls Ls 40,000 <br />Electrical controls La Ls La 40,000 <br />Miscellaneous plant equipment Ls Ls La 20,000 <br />Subtotal $430,000 <br />Contingencies - 25% :: 70,000 <br />Field Cost $500,000 <br />Transmission Line <br />Additional. to Plan 3 - FieJ.d Cost 50,000 <br />Pipeline <br />(32,000 feet of 60" preten. <br />concrete. Q = 125 cubic feet <br />per second) <br />Excavate trench cy 100,000 0.40 40,000 <br />Compacting b~ckfill cy 22,000 2.50 55,000 <br />Backfill cy 35,000 0.35 12,250 <br />Highw~ crossings ea. 6 1,000.00 6,000 <br />Outlet structure ea. 1 2,500.00 2,500 <br />Right-of-way easement Acres 50 200.00 10,000 <br />Furnish and lay 25Q' head pipe If' 5,000 40.00 200,000 <br />Furnish and lay 200 I head pipe If 5,000 38.00 190,000 <br />Furnish and lay 1]50 I head pipe If 22,000 36.00 792,000 <br />Pipe fittings, valves, misc. Ls La Ls 50,000 <br />Subtotal 1,351,750 <br />Contingencies - 25% ~ 342,250 <br />Field Cost 1,700,000 <br />Total fieJ.d cost 2,250,000 <br />Indirect costs - 25% + 550,000 <br /> 2,ClOO,000 <br />Additional. investigations 25,000 <br />Cost of adding to Plan 3 for Plan 4 2, Cl25, 000 <br />Construction cost - Plan 3 5,525,000 <br />Construction cost - Plan 4 $Cl,350,000 <br /> <br />r ~ ,""' ~ .", ') <br />\J .... ,,, ..lI. ....J '- <br /> <br />10 <br />