My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07271
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:34 PM
Creation date
10/12/2006 2:13:30 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.09
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
8/11/1989
Author
USDOI-BOR
Title
Draft Study Plans for the Conservation Measures for the Biiological Opinion on the Operation of Glen Canyon Dam
Water Supply Pro - Doc Type
Biological Opinion
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />t~ <br /> <br />.j'i'. <br /> <br />" <br /> <br />Conservation Measure 5: Conduct Research to Identify Impacts of <br />Glen Canyon Dam Operations on the Humpback Chub in the Mainstem <br />and Tributaries. <br />(Page 20) <br /> <br />A. Program Responsibility - Robert Williams and David L. <br />Wegner (GeES) <br />B. Estimated Time for Completion - Fiscal year 1992 <br />C. Estimated Cost for Completion - $1,245,000 <br />D. Funding Source - CRSP/GCES <br /> <br />Conservation Measure 6: Establish a Monitoring Program to Assess <br />the Long Term Relationship of Project Operation to the Humpback <br />Chub in the Grand canyon. <br />(Page 31) <br /> <br />A. Program Responsibility - Robert Williams and David <br />L. Wegner (GCES) <br />B. Estimated Time for Completion - on-going <br />C. Estimated Cost for Completion - Through fiscal year 1991: <br />$100,000 <br /> <br />D. Fund:ng Source - CRSP/GCES <br /> <br />Conservation Measure 7: <br />Aggregation of Humpback <br />(Page 34) <br /> <br />Establish, if Possible, a Second Spawning <br />Chub in the Grand Canyon. <br /> <br />A. Program Responsibility - Robert Williams and David L. <br />Wegner (GCES) <br />B. Estimated Time for completion - Fiscal year 1992 <br />C. Estimated Cost for Completion - $105,000 <br />D. Funding Source - CRSP/GCES <br /> <br />Summary statistics <br /> <br />A. Program Timing <br />1. Research and Development = Fiscal year 1989 - 94 <br />2. Completion of Initial Research = Fiscal Year 1994 <br />3. Monitoring = On-going for life of project <br /> <br />B. Estimated Costs - Completion of Research and Development <br /> <br />Total Program Costs = $ 1,570,000 <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.