My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07271
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:34 PM
Creation date
10/12/2006 2:13:30 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.09
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
8/11/1989
Author
USDOI-BOR
Title
Draft Study Plans for the Conservation Measures for the Biiological Opinion on the Operation of Glen Canyon Dam
Water Supply Pro - Doc Type
Biological Opinion
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />{7) <br />S~ ';-/ <br /> <br />Draft # 2, August 3, 1989 <br /> <br />DRAFT STUDY PLANS FOR THE <br />CONSERVATION MEASURES FOR THE <br />BIOLOGICAL OPINION ON THE <br />OPERATION OF GLEN CANYON DAM <br />(2-21-87-F-23) (BR-AZ) <br /> <br />SUMMARY OF KEY ASPECTS <br /> <br />Conservation Measure 1: Taxonomic Status of the Genus Gila <br />(Page 3) <br /> <br />A. <br />B. <br />C. <br /> <br />Program Responsibility - Reed Harris <br />Estimated Time for Completion - Fiscal year 1994 or 1995 <br />Estimated Cost for Completion - No separate funding <br />attributable to Grand Canyon Gila cypha work <br />Funding Source - This is com~letelY funded through the <br />Upper Basin Recovery and Implementation Plan (UBRIP). <br /> <br />D. <br /> <br />Conservation Measure 2: Maintenance of Hatchery Stocks of Grand <br />Canyon Humpback Chub <br />(Page 7) <br /> <br />A. program Responsibility - Reed Harris <br />B. Estimated Time for Completion - Fiscal Year 1992 <br />C. Estimated Cost for Completion - $35,000 (GCES) <br />D. funding Source - This is primarily funded through the <br />VBRIP with supplemental funding supplied by GCES <br /> <br />Conservation Measure 3: Establish criteria for and Probability of <br />Flood Releases from Glen Canyon Dam <br />(Page 11) <br /> <br />A. Program Responsibility - Randall Peterson <br />B. Estimated Time for Completion - Fiscal Year 1992 <br />C. Estimated Cost for Completion $20,000 <br />D. Funding Source - CRSP/GCES <br /> <br />Conservation Measure 4: Development of a Management Plan for the <br />Little Colorado River <br />(Page 14) <br /> <br />A. Program Responsibility - Navajo Nation and David L. <br /> Wegner (GCES) <br />B. Estimated Time for Completion - Fiscal year 1991 <br />C. Estimated Cost for Completion - $65,000 <br />D. Funding Source - CRSP/GCES <br /> <br />1 <br /> <br />"C,: <br /> <br />", <br />,{' <br /> <br />.:~, <br /> <br />0, <br /> <br />,> <br /> <br />~'. <br /> <br />., <br /><'. I <br /> <br />",'" <br />'( <br />~~ <br /> <br />:.'):; <br />':; <br /> <br />" <br />". <br /> <br />"~- <br /> <br /> <br />.r;!' <br />:~ <br />\i~! <br /> <br />,~.,H:. <br /> <br />r"., <br />
The URL can be used to link to this page
Your browser does not support the video tag.