My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07254
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07254
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:29 PM
Creation date
10/12/2006 2:13:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.766
Description
Gunnison River General
State
CO
Basin
Gunnison
Water Division
4
Date
1/1/1982
Author
Unknown
Title
Conditional Reservoir Rights - Division 4 - Colorado-Ute - Cities of Delta-Aurora-Gunnison Et Al - 1982-1986 - Part I
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />." <br /> <br />(~'~:.; <br /> <br />I~...... <br />I ~. ~,:;:; <br />.~. . <br /> <br />k. <br /> <br />0.)2365 <br /> <br />relatively flac terrain between the tunnel outlet and Antero <br />Reservoir. <br /> <br />B. <br /> <br />A location map (Rxhipi~A) is available at hater <br />Clerk's Office. <br />WILLOW CREEK COLLECTION SYSTEM AND BERTHA GULCH TUNNEL <br />(a/}:/ a WIl.LOW CREEK. TUNNEL) . <br /> <br />, <br /> <br />A sY5te~ of diversio~ f~cilities, cpe~ channels. and a <br />tunnel carrying ~ater from Bertha Gulch, three un~a~ed <br />cributaries of Cow Creek, and willow Creek, through the willow <br />Creek Tunnel inco Union Park Reservoir. <br /> <br />C. TAYLOR PARK PUMPING PL~NT. <br /> <br />Water will be diverted from the Taylor River at Taylor <br />Park Reservoir and pumped through a tunnel to Union Park <br />Reservoir. See paragraph 3.C. below for diversion point. <br /> <br />D. UNION PARK RESERVOIR. <br /> <br />The storage structure included in the project is the <br />Union Park Reservoir which was originally decreed by the Water <br />Courc, Water Division ~, on June 14, 198~, in Case No. 82CW3~0. <br />The adjudication was for 325,000 acre feet of water to be used as <br />part of the Union Park Hydroelectric Project. Union Park Dam <br />will be an on channel structure on Lottis Creek. Water will be <br />stored from Lottis Creek, transported from willo~ Cyeek and <br />p~~ped from Taylor Park Re5e~voir t~ ~he Union ?a~k ~eservoir <br />w~e=e i~ will be stored fo~ subsesue~t use and yeuse. <br /> <br />3. Legal Description of ?oints of Dive=sion a~d L~catio~s of <br />projec~ Facilities: <br /> <br />A. UNION-ANTERO CONDUIT. <br /> <br />The point of a~version from Union Park Reservoir will <br />be located at a point which bears South 9'07'06" West a <br />discance of :3,693.0 feec from the Northwest corner of <br />Sec~ion 21, ~ownship 14 South, Range 82 West of the 6th <br />P.~~., Gunnison County, Colorado. <br /> <br />6! CUCJOOG27 <br /> <br />::;Q <br />
The URL can be used to link to this page
Your browser does not support the video tag.