Laserfiche WebLink
<br />. <br /> <br />1',) <br />W <br />o <br />~ <br /> <br />. <br /> <br />. <br /> <br />Table 2 <br />Cost Summary-Pilot Knob to Drop 1 <br /> <br />I nvestment Cost <br /> <br />$ 35,720,000 <br /> <br />Annual Equivalent Investment <br />(100 Years at 6 Percent Interest) <br /> <br />2,150,000 <br /> <br />Annual Water Savings <br /> <br />48,000 acre-feet <br /> <br />Reject Stream Replacement <br />Requirement <br /> <br />42,000 acre-feet <br /> <br />Surplus Water (Benefit of <br />$26.00 per acre-foot) 1/ <br /> <br />6,000 acre-feet <br /> <br />Direct Annual Benefits of 6,000 <br />acre-feet <br /> <br />156,000 <br /> <br />Net Annual Cost of 42,000 acre-feet <br />Reject Stream Replacement Water <br /> <br />1,994,000 <br /> <br />Cost per acre-foot <br /> <br />$ 47.50 <br /> <br />11 <br /> <br />Coachella Canal Lining; Special Report, Bureau of Reclamation, August <br />1973, Page 4. <br /> <br />12 <br />