Laserfiche WebLink
<br /> <br /> <br />l;l)2277 <br /> Summary <br />Table S-1.-Project features to be constructed in Phases I and II <br /> (Proposed Plan) <br /> Phase I <br />Project feature SfageA Stage B Phase I r <br />Dams and reservoirs: <br />Ridges Basin Dam and Reservoirl X <br />Southern Ule Dam and Reservoir X <br />La Plata Diversion Dam X <br />Southern Ute Diversion Dam X <br />Pumping plants: <br />Durango Pumping Plant' X X <br />Ridges Basin Pumping Plant' X X X <br />Red Mesa Pumping Plant X <br />Alkali Gulch Pumping Plant X <br />Ute Mountain Pumping Plant X <br />Southern Ule Pumping Plant X <br />Third Terrace Pumping Plant X <br />Canals and pipelines: <br />Ridges Basin Inlet COnduit' X <br />Dry Side Canal X (24.3 miles) X (2.0 miles) <br />Long Hollow Tunnel X <br />Southern Ute Inlet and Interim <br />Irrigation Canal X (5.4 miles) X (0.6 mile) <br />New Mexico Irrigation Canal X <br />Durango M&I Pipeline X <br />Shenandoah M&I Pipeline X <br />La Plata Rural M&I Pipeline2 X <br />Laterals: <br />Red Me.Sa laterals X <br />Alkali Gulch Laterals X (13.8 miles) X (9.6 miles) <br />Dry Side Laterals X (29.1 miles) X (2.5 miles) <br />Ute Mountain Laterals X <br />Southern Ute laterals X <br />La Plata laterals X (16.2 miles) X (7.8 miles) <br />Drains:) <br />Red Mesa Drains X <br />Alkali Gulch Drains X X <br />Dry Side Drains X X <br />Ute Mountain Drains X <br />La Plata Drains X X <br />Other 1eatures: <br />Electrical transmission 1acllities~ X X X <br />Permanent operating facilities'" X X X <br />Recreation facilities: <br />Ridges Basin Reservoir recreation X <br />Southern Ute Reservoir recreation X <br />Recreation, fish, and wildlife mitigation measuresl5 X X X <br />Cultural resource measures X X X <br /> <br />1 Design at these features could be downsized following ESA consultation. <br />2 Phase I. Stage A feature only. <br />J After Project landS are irrigated, adequate drains would be installed as required. <br />. Electrical transmission facilities would be constructed concurrently with those facili!ies requiring electrical power. <br />S Permanent operating facilities would be constructed concurrently with Project features requiring moniloring and <br />operation and maintenance. <br />6 Recreation. fish, and wildlife mitigation measures would be implemented commensurate to and eIther prio! to or <br />concurrently with impacts resulting from construction and operation of Project features. <br /> <br />5-5 <br />