My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07192
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:11 PM
Creation date
10/12/2006 2:10:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141
Description
Fryingpan-Arkansas Project
State
CO
Basin
Arkansas
Water Division
5
Date
12/1/1962
Author
unknown
Title
Ruedi-Western Slope Investigations Colorado Reconnaisance Reports on Basalt and Bluestone Projects
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />08~J <br /> <br />Su1"MARY SHEETS (Continued) <br /> <br />Bluestone Project <br /> <br />~ <br /> <br />Project costs (January 19(2 prices) <br />Ruedi Darn and Reservoir . . . . . <br />Sharrard Park Pumpine Plants and CanRI <br />Una Diversion Dam <br />Una Power Canal . <br />Una l'owerplant <br />Una Pumpin~ Plant <br />Una Pump Canal <br />r1t. Logan Reservoir <br />Farm laterals <br />Drains ...... <br />Total <br />l/ Portion of reimbursable cost assirnable <br /> <br />. . <br /> <br />Annual operation and maintenance <br />cost (1959-61 prices) .... <br /> <br />l/$990 ,200 <br />572,500 <br />986,000 <br />1,290,OOO <br />4,550,000 <br />920,000 <br />828,000 <br />750,000 <br />567,400 <br />204,400 <br />11,658,500 <br />to Bluestone project. <br /> <br />. . . . , . . . . . . . <br /> <br />$83,000 <br /> <br />Irri~.~lc "roc (pcr~s) <br />Supplemental Full <br />se~vice service Total <br /> <br />Alfalfa, pasture, and other <br />livestocl, feeds; fruit, pota- <br />toes, beef cattle, and sheep <br />Avera~c elevation of project lands (ft. above sea level) 5,500 <br />Averare frost-free period (days) . . . . . . . . . . . . 148 <br />Averafe annual diversion requirement (ac.-ft. per acre) <br />Upper Roan Creek area <br />Lower Roan Creek area <br />Sharrard Park area <br />Avera~e A~nual requirement for project water (ac.-ft.) <br />AveraGe annual project supply (ac. -ft. ) <br />Irrigation payment capacity <br />Per acre-foot of project water <br />Total ennual .... . . . . . <br />Less operation and maintenance <br />Amortization capacity. , <br />Ad valorem tax revenueS . . <br />Total annual payment . <br /> <br />IRRIGATION <br /> <br />Roan Creek <br />Under Una Pump Canal <br />Above Una Pump Canal <br />--S~ arrar4-l'ark- . ~. -- -- <br />Total <br /> <br />1,874 <br /> <br />1,87U <br /> <br />Principal agricultural production <br /> <br />6 <br /> <br />2,375 4,249 <br />2,200 2,200 <br /> <br />-- - ~ g:~~t-- - --~~-- <br /> <br />3.75 <br />4.47 <br />3.68 <br />25,400 <br />25,300 <br /> <br />$2.64 <br />66,800 <br />35 ,400 <br />3l,Loo <br />I,OOO <br />32,400 <br />
The URL can be used to link to this page
Your browser does not support the video tag.