Laserfiche WebLink
<br />Farm Plan for a Sheep Ranch with 80 Aores of Irrigated <br />Land and 130 acres of Dry Lands made up of Land Classes <br />Proportional to those in the Proposed Project Area. <br />(Suitable for a Spanish-American Family) <br /> <br />Irrigated <br /> <br />Yield per A. Total yield. <br /> <br />:By-products <br /> <br />6 A. <br />6 A. <br />6 A. <br />30 A. <br />30 A. <br />2 A. <br /> <br />barley <br />oats <br />oorn <br />alfalfa <br />irrigated pasture <br />garden <br /> <br />35 <br />40 <br />30 <br />2.8 <br />1.6 L.S. <br /> <br />210 :B. <br />240 13. <br />180 B. <br />84 T. <br />Units or 8 <br /> <br />feed straw <br />fodder <br /> <br />sheep per A., 7 mos. <br />roughage <br /> <br />(-;:~X' <br />\_~/' <br /> <br />Dryland <br />1S A. wheat <br />, 3 A. beans <br />15 A. dryland pasture <br />58 A. good grazing <br />~A. rough grazing. <br />210 A. (All grades of <br />sented) <br /> <br />15 <br />400{f <br />(receives scant <br /> <br />180 B. <br />1200 fl. <br />spring flood <br /> <br />straw <br />irrigation) <br /> <br />rocks, end woodland <br />land to be aoquired are proportionately repre- <br /> <br />Livestock <br /> <br />Home use <br /> <br />Livestock Sales Produot Sales <br /> <br />2 horses 0 <br />3 oows and oalves $ <br />1 heifer and 1 <br />yearling 1 <br />245 ewes and buoks 5 <br />lambs (keep 50) 10 <br />2 broad sows & <br />p:gs 5 <br />60 In.ens, ducks, <br />geese, turkeys 50 <br /> <br />o <br />$ 20 <br /> <br />o <br />$ 100 <br /> <br />90 <br />1,200 <br /> <br />550 <br /> <br />75 <br /> <br />10 <br />$1.395 <br /> <br />10 <br />$660 <br /> <br />Total cash income: livestock $2,055, AAA $25, - $2,080.00 <br />Operating costs: feed, salt, etc., $30, seed and treating $65, threshing <br />and twine $50, machinery repairs $20, auto and trucking $125, taxes $170, <br />irrigation, 0 and M, $126, farm improvements $50, miscellaneous crop and <br />. <br /> <br />livestock expenses $80, fees, eo-op, vet., etc. $15, shearing $60, insurance <br />$25, hired labor $30, replacements $4e~ Total operating $886. <br /> <br />;j <br />