Laserfiche WebLink
<br />eradication work that cannot be done by the individual farmer. <br /> <br />In the development of the project area and the settlement of it with <br /> <br />farm families some 110 sets of new farm buildings will be required, <br /> <br />with the fencing and other improvements that would be required on farms <br /> <br />of from 80 to 100 irriga.ted acres each, with larger complementing <br /> <br />acreages of several classes of grazing lands. The southern part of the <br /> <br />area is suitable for the resettlement of Spanish-American families and <br />where <br />adobe buildings'would be most satisfactory and economical~/ Livestock <br /> <br />housing would be mostly for sheep. <br /> <br />The Durango Lumber Company currently quotes prices on building material <br /> <br />as follows: <br /> <br />$ 1.10 <br />35.00 <br />60.00 <br />70.00 <br />80.00 <br />96.00 <br />80.00 <br />40.00 <br /> <br />cwt. cement <br />M. native pine, No. 1 - planks or dimension <br />M. lap siding, cedar - A Grade <br />M. drop siding, cedar - C Grade <br />M. flooring, fir - D Grade (lx4) <br />M. flooring, fir - C. Grade (lx4) <br />M. flooring, pine - clear (lx4) <br />M. flooring, pine - common (lx4) <br /> <br />Such information regarding factors governing costw of land leveling. <br /> <br />land clearing, and other works of land development as is now available <br /> <br />~ has been presented above. When the survey work is completed the estimates <br /> <br />of the Farm Security Administration engineers will be incorporated in <br /> <br />this report if it has not yet been submitted, or otherwise submitted as <br /> <br />a supplemental report. <br />