My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07190
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:10 PM
Creation date
10/12/2006 2:10:24 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.124.A
Description
Pine River
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
1/1/1942
Title
Preliminary Investigation Proposed Pine River Irrigation Project: Preliminary Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ready mentioned, or serving the northern part of the proposed project <br /> <br />ares" will be enlarge<l and consolid.ated. <br /> <br />Each will be extended to include, at its highest level obtainable with <br />euf.ficient fall, all possible irrigable land, since there is believed <br />to be sufficient '''ater for all la,nd that can be brought under ditch. <br />Al though the canals and latera,ls will be enlargErd., not much chap..ge'~rill <br />be needed in location, except for extension. Thus with enlargement, <br /> <br /> <br />repair and extension, the present system will suffice for the northern <br /> <br /> <br />and already partly developed part of the area; and for supply to the <br /> <br /> <br />proposed extensio~ of the Morrison Consolidated. This extension is to <br /> <br /> <br />be located along the highest feasible level, to serve the southern part <br /> <br /> <br />of the proposed project area, which is entirely new land where initial <br /> <br /> <br />construction of a new distribution system will be required. <br /> <br />,These new lands extend some 9 miles south in direct distance (much farther <br />by canal) from the present end of the ditch almost to the state line. <br />.The present location of the now southern part of the canal will probably <br />be relocat<:ld. to g<:lt maximum obtainable elevation and thus serve more land. <br />Until the-proposed canal extensions are located; the acreages to be served <br />cannot be exactly determined or classified. A preliminary location sur- <br />vey of the proposed Morrison extension has been made, however, sufficient <br /> <br />to determine this \"ith reasonable closeness. <br /> <br />Factors Affecting Proposed Development <br /> <br /> <br />Of the 34,320 r,cres comprising the IJroject area 5,3.;:;.8 acres ar:eabove t{he <br /> <br /> <br />level of the di tch."These lands include considerable arees of arable <br /> <br />" <br />
The URL can be used to link to this page
Your browser does not support the video tag.