My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07182
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07182
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:08 PM
Creation date
10/12/2006 2:10:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8142.600.20
Description
Trinidad Project - Environmental Studies
State
CO
Basin
Arkansas
Water Division
2
Date
3/1/1992
Author
Various
Title
Trinidad Lake North Watershed - Las Animas - Colorado - Watershed Plan and Environmental Assessment
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Wetlands - Minimal impact will occur with periodic type <br />changes due to the presence of sediment basins. <br /> <br />Wildlife Habitat - Quality enhanced. <br /> <br />with project action, sound resource management practices <br />will be implemented on a broader scale than they are presently. <br />As these practices are implemented, it is anticipated that the <br />range and grazeable woodland (Resource Base) within the watershed <br />will ,improve. <br /> <br />The economy of the area is heavily dependent on agriculture. <br />with the improved resource base within the watershed, the economy <br />is expected to expand. <br /> <br />As the economy expands there will be some resource <br />depletion. The depletion will be in the form of energy, labor <br />and materials, all .of which are irretrievable. <br /> <br />Major Conolusions: <br /> <br />The life of Trinidad Lake will be increased due to decreased <br />sediment loading and a significant improvement in its water <br />quality will be realized. In addition, the land resource base <br />will be maintained or improved. The expected project benefits <br />exceed the costs of the planned treatment. <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.