Laserfiche WebLink
<br />" <br />'Oli 1 '/23 <br /> <br />. <br /> <br />. <br /> <br />relocating the outlet works from the right to left abutment. The definite <br /> <br />plan report is scheduled for completion in December but will probably be <br /> <br />delayed two or three months by the above decision to obtain a revised <br /> <br />design and estimate for the Soap Park Dam. <br /> <br />Land classification work and water supply studies on the Savery-Pot <br /> <br />Hook Project are continuing. A meeting is scheduled for December 6, 1966, <br />in Denver with the Bureau of Land Management to determine what work can <br /> <br />be scheduled to up-grade cadastral surveys in the project area. <br /> <br />6 <br />