My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07163
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07163
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:02 PM
Creation date
10/12/2006 2:09:24 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8111.800
Description
Arkansas River Compact Administration
Basin
Arkansas
Water Division
2
Date
1/1/1965
Author
Federal Power Comm
Title
Upper Arkansas River Basin - Planning Status Report - Water Resource Appraisals for Hydroelectric Licensing
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.XISTING WATBR REU50URem DEVELOPM.NTS <br /> <br />o <br />(}t <br />l\.:' <br />C) <br /> <br />The Bureau of Reclamation is currently constructing the Cheney <br />Division of the Wichita Projeot. The Cheney Reservoir on the Ninnescah <br />River will provide supplemental municipal and industrial water to <br />Wichi ta, Kansas and will provide downstream flood control. Maximum <br />drawdown of the reservoir is limited to protect fish and wildlife. <br /> <br />Table 2 lists existing hydroelectric projects in the Upper <br />Arkansas River Basin. All of these projects are relatively small <br />installations and in most cases have been in operation for many years. <br />The Ruxton and Manitou plants of the City of Colorado Springs are uti- <br />lized in coordination with the water supply reservoirs of that city. <br /> <br />Table 2 <br /> <br />Existing Hydroe1ectric Projects <br />Upper Arkansas Basin <br /> <br />Map ClImer <br />S 01 Project River ClasB 1 Owner <br />A So.lidA No. 1 Arkansas U pse 11 <br />B Salld.a .He. 2 Arkansas U pse 11 <br />c Skaguay Bea.ver Cr. U sepc'iJ <br />D Ma:a.1tou Ruxton Cr. P CCS 21 <br />E Ruxton Park Ruxton Cr. P ecs 21 <br /> Total <br /> <br />Licensed <br />Project <br />No. <br /> <br />2275 gj <br />2275 gj <br /> <br />Installed Initial <br />Capaclt Operation <br />kv <br />750 Y 1905 <br />560 1/ 1906 <br />1,500 1901 <br />5,000 1929 <br />1,000 1925 <br />8,810 <br /> <br />768 <br /> <br />!/ U - Privately-owned utility; P - Non-Federal publicly-owned utility. <br /> <br />gj License application pending. <br /> <br />Ji Public Serv1ce Company of Colorado'. <br /> <br />Y Southern Colorado Paver Company. <br /> <br />2/ Cl ty of Colorado Springs. <br /> <br /> <br />Y Original capacity 1,070 kilovatto. 'I'Ve 160 lev units now abandoned. <br /> <br />11 Origina.l. capacity 800 kilowatts. Q1e 240 kv unit now abandoned. <br /> <br />- 7 .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.