My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07161
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07161
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:02 PM
Creation date
10/12/2006 2:09:22 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272.100.60
Description
Colorado River Basin Salinity Control Forum
Basin
Colorado Mainstem
Water Division
5
Date
3/1/1981
Author
CRBSCF
Title
Fourth Annual Progress Report - Water Quality Standards for Salinity - Colorado River System - March 1981
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />l\) <br />~ <br />w <br />en <br /> <br />Construction funding for the Paradox Valley Unit <br /> <br />for FY 1980 was $3,163,000. Fiscal Year 1981 funding <br />is $3,027,000. <br /> <br />Grand Valley Unit - Activities in Stage I of this <br />unit are progressing. The Operation and Maintenance contract <br />for the Stage I area between the United States and Grand <br />Valley Water Users Association was signed March 11, 1980. <br />A contract for construction of the field station was awarded <br /> <br />July 8, 1980, to Leon Parkerson for $363,000 and notice to <br />proceed was given July 9. Completion is expected by May 1981. <br />A $7.4 million contract for lining the 6.8-mile section <br />of the Government Highline Canal was awarded to Peter Kiewit <br />Sons Company on August 6,1980. Notice to proceed was given <br />August 11, 1980. The contractor moved onsite August 18 to <br />begin mobilizing equipment and preirrigating borrow areas. <br />Although the contract calls for completion by August 1983, <br />the contractor has indicated his intent to complete the <br />canal lining during the winter of 1980-81. <br /> <br />" <br /> <br />" <br /> <br />On August 4, 1980, Acting Assistant Secretary of the <br />Interior Daniel Beard signed a letter informing the Congress <br />of the Department's intent to use closed pipe laterals in <br />the Stage I area unless directed otherwise by the Congress. <br />Since that proposal has been sustained, WPRS is preparing <br />final specifications with the objective of awarding a contract <br /> <br />;"1 <br /> <br />, <br />, <br /> <br />-8- <br /> <br />" <br />, <br /> <br />,~ <br />" <br /> <br />,\ <br /> <br />" <br />
The URL can be used to link to this page
Your browser does not support the video tag.