Laserfiche WebLink
<br /> <br />e <br /> <br />e <br /> <br />003n27 <br /> <br />. <br /> <br />for fuMer development. and the optimization of Colorado's <br />Compact apportionment. <br /> <br />To support water resources management within the State of <br />Colorado. including the use of basin wide models and the <br />evaluation of existing and future in-stream flow appropriations. <br /> <br />To support and optimize near-real time administration of Colorado <br />water rights with information sharing among water users and <br />through the establishment of computer-based data and model <br />repositories, <br /> <br />To accomplish the above an additional objective has been <br />established to develop these facilities through software and <br />hardware which are accessible by users representing a wide variety <br />of interests and various levels of expertise regarding water <br />resources modeling and analysis and information technology, <br /> <br />. <br /> <br />. <br /> <br />Project Organization <br /> <br />The Colorado Water Conservation Board retained Dames & Moore and the <br />Center for Advanced Decision Support for Water and Environmental Systems <br />(CADSWES) of the University of Colorado team to perform a feasibility study <br />of the proposed Colorado River Decision Support System, The consultant team <br />was organized and structured to offer the CWCB a common sense approach to <br />the initial planning of the CRDSS in a short time-frame. <br /> <br />To meet the project's goals. the Co-Project Management Team, formulated a <br />work plan to be addressed during the project consisting of ten tasks: <br /> <br />. l.Defintion of Needs <br /> <br />. <br /> <br />2. Evaluation of Models and Procedures, <br />3. Definition of Data Requirements. <br />4. Definition of Alternative Interfaces, <br />5. Conceptual Design of Alternative DSS Architectures. <br />6. Alternative System Development Cost Estimates, <br />7. Operation. Maintenance. and Replacement <br />8. Summary of Alternatives and Recommendation, <br />9. Refined Cost Estimate and Work Plan. <br />10, IMe Feasibility Study Report. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />The project proceeded through the above tasks in roughly the order indicated; <br /> <br />Consulting Team <br /> <br />Project Tasks <br /> <br />DAMES&MOORE/CADSWES-9 <br />