My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07128
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07128
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:25:51 PM
Creation date
10/12/2006 2:06:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.09A
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
2/13/1990
Title
Draft GCES Research Flow Plan
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />"JJodJ. c <br /> <br /> <br />--- <br />FE805 '90 17:19 <br /> <br />ARIZONA STATE <br />UNIVERSITY <br /> <br />GI.!N Ol\NVON <br />ENVIRONMENTAL STUDIES <br />P. O. BOX 1811 <br />FLAGSTAFF, AZ. 86002 <br /> <br />T~;vjr'f.. "RllO'" .45~"':" <br /> <br />CI!:Nf'f" ~o" e:NVIROH"INTAL STUOIES <br /> <br />February 5, 1990 <br />TO: Executive Review Committee, Glen canyon Environmental Studies <br /> <br />From: Duncan T. Patten <br /> <br />subject: Research Plan <br /> <br />I am attaChing a copy ot the short-term Research Plan. This <br />document includes a Summary, the Plan, and a Justification for <br />Research Discharges. The approach I have taken is to address <br />those issues that appear to be critical and are in need ot <br />answers for the EIS. This plan does not include everything <br />everyone wanted. It is also designed to be done in a shorter <br />period of time than most re.earchers have wanted. It should be <br />obvious that the answers we will qet from this plan may well have <br />a wide degree of variation, thus interpretations will not be <br />absolute. It is the best we can do in a short time frame. <br /> <br />This Research Plan will require the development of detailed <br />research designs. It will also require alot of man power and <br />complicated logistical support. We may be better off extending <br />this over at least another year. <br /> <br />Eventually, we will be putting together a long term plan that <br />will address monitoring needs and the information needed to <br />interpret the data that will be obtained from the monitoring <br />program. This longer term monitoring/research program Should <br />eventually be one component of the EIS mitigation program. <br /> <br />I loox ~orward to presenting this Research Plan to you February <br />9th and havinq the opportunity to discuss it. <br /> <br />..1 <br />/,-;/ <br />,,:". ,. <br />/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.