<br />Table 3
<br />Comparison of alternative
<br />plans cost effectiveness
<br />
<br />Estimated costs (Oct 90 prices)
<br />
<br />No System Canal
<br />act ion 1 combination2 imorovement3
<br /> $3,630,000 $3,630,000
<br /> 6,380,000
<br /> 1,060,000
<br /> 60,000 60,000
<br /> 9,600,000
<br /> 79,000 79,000
<br /> 31, 700 22.400
<br /> 14,460,700 10,171,400
<br /> 346,800 243.900
<br /> 14,807,500 10,415,300
<br /> 890,600 626,500
<br />
<br />Canal improvement
<br />Stubb Ditch
<br />Price Ditch
<br />Pump plant
<br />Wildlife
<br />Increased lateral cost 2
<br />Prorated share of moss screens
<br />Irrigation management services
<br />Subtotal
<br />
<br />Interest during construction
<br />
<br />Total investment
<br />
<br />Annual equivalent cost of investment
<br />(5 5/8% interest over 50 years)
<br />
<br />Annual OM&R & power costs
<br />O&M
<br />Stubb Ditch
<br />Price Ditch
<br />Increased carriage costs
<br />Pumping plant
<br />Increased laterals
<br />Wildlife O&M
<br />Replacement costs
<br />Stubb Ditch
<br />Price Ditch
<br />Pumping plant
<br />
<br />$39,000
<br />108,800
<br />
<br />33,600
<br />
<br />33,600
<br />30,000
<br />
<br />32,000
<br />14,200
<br />1,500
<br />1,000
<br />
<br />1,000
<br />
<br />69,100
<br />
<br />11,500
<br />
<br />Annual OM&R & power costs 4
<br />
<br />147,800
<br />
<br />93,800
<br />
<br />133,700
<br />
<br />Total annual costs
<br />
<br />147,800
<br />
<br />836,650
<br />
<br />612,400
<br />
<br />Tons of salt removed
<br />Ditches
<br />Increased laterals
<br />Total
<br />
<br />12,500
<br />3,000 5
<br />15,500
<br />
<br />11,500
<br />
<br />11,500
<br />
<br />Annual cost per ton of salt removed
<br />
<br />N/A
<br />
<br />54
<br />
<br />53
<br />
<br />1 No Action is assumed to be the FEIS recommended plan.
<br />2 Lateral systems under the East End Government Highline Canal and
<br />the Price Ditch would be expanded due to realignment if the Price Ditch
<br />were abandoned.
<br />3 Price Ditch is lined and Stubb Ditch is placed in pipe.
<br />4 Total annual costs for each alternative, are a sum of the preceding
<br />annual costs minus the no action annual costs.
<br />5 This value is dependent upon the amount of existing improvements
<br />that would be replaced upon failure, the current condition and the expected
<br />life of the existing improvements.
<br />
<br />16
<br />
|