Laserfiche WebLink
<br />co <br />1:"- <br />- <br />o <br />--:> <br />,:;) <br /> <br />CHAPTER II <br /> <br />DESCRIPTION OF ALTERNATIVES <br /> <br />Recommendations <br /> <br />It is recommended that the Stubb Ditch be placed in pipe where hydraulic <br />conditions permit and that the Price Ditch be lined. The system <br />combination alternative would solve more design problems than the <br />recommended plan, but operating the combined system posed administrative <br />problems and significant opposition to removing the Price Ditch was <br />expressed. <br /> <br />It is also recommended that the detention ditches and ponds for the East <br />End Government Highline Canal, presented in the FEIS recommended plan, be <br />deleted. If the detention ponds are eliminated, the wildlife measures will <br />be supplemented to fully replace the habitat values the detention ponds <br />would have created. <br /> <br />15 <br />