Laserfiche WebLink
<br />(" ~c:., <br />"IOJ <br />14 FRYING PAN-ARKANSAS PROJECT, COLORADO <br /> <br />1..... <br />.\ \ <br /> <br />PROJECT REVENUES <br /> <br />In tbIs aulysis, quantities of water and power supplied by the proJed aod <br />proposed charges for these products nre identical with amounts contained in the <br />reevaluation statement. Estimnted tax proceeds from the Southeastern Colorado <br />Water Conservancy District, however, are revised slightly. <br />As reported by the Colorado State Tax Commission, the district's assessed <br />value tor 1960 amounted to $425,940.000. representing a gain of 6 percent over <br />the 1050 figure of $401,522,000. Def-illite this substantial increaRe, projections <br />of future district assessed vulue and tax proceeds were held to less than 2 per. <br />cent increllse annually. Actually, the annual incremental increase amounts to <br />1.9 percent of the 11100 base which will yield $8,000 per year at the I-mill levy. <br />The corresponding figure in the reevaluation :statement is $7,000 a year. <br />Net annual revenues attributable to the reimbursable project functions show <br />Borne variation with corresponding data in the reevaluation statement. This <br />arises due to different allocations ot IlnuullI O.M. & R. costs which are handled <br />as revenue deductions. Power, in particular, shows n substantial net revenue <br />increase which is due to the reduction in estimated annual replacement reserves. <br />Also, annual net revenue requirements for the municipal water deli\'er~' system <br />show an increase oyer the figure in the reevaluation statement.. This cbange <br />arises mainly becaus.e annual nmortization requirements are higher at the 2.6.12 <br />percent interest rate. Annual project revenues are listed In detail on page 7. <br /> <br />,,,,,j <br />',~:'.~ <br /> <br />R.EPAYMENT <br /> <br />Power <br /> <br />'.rhe ]lower Rystem average rate and repayment study near the end of this <br />statement shows all details of reimburHement ot power costs. Project power <br />facilities are entered into plant-in-service as they become revenue producing <br />over the period of fiscal years 1067 to 1!)7fi. Each increment of innstment is <br />amortized witb interest at 2.632 percent within a 50-year period. The entire <br />power iuvestwent of $64,Sa1,000 is repaid in the 41st yellr after completion of <br />construction, <br />Beginning in the 41st year after construction, power revenues are applied <br />to assist in repayment of irrigation eosts. Through the 49th year power assist- <br />ance ot $1O,41l,2::i9 to complete IrrigatIon repayment is accomplished. A revenue <br />surplus of $2,[)75,6.1D is shown at the end of the 50th year. <br /> <br />Irrigation: <br />Project ''''"ater (49,500 acre-feet at $5.40) _______________________ <br />Twin Lakes service (11,800 acr~-feet at $3) ____________________ <br />Regulation of winter water (05,900 acre-feet at $2.25)__________ <br />Conservaney District ta%_____________________________________ <br /> <br />A:nnual revenue8-Function and Baurce of re't'Cnue <br /> <br />Amount <br />$207, ~OO <br />35,400 <br />148,275 <br />1516,160 <br /> <br />SubtotaL _ <br />LessO.~~ & -fl~-~~t;=========================================: <br /> <br />967,135 <br />86,010 <br /> <br />Net irrigation revenues____ ____ ___ ____________________________ <br /> <br />881, 125 <br /> <br />Power: <br />469.2 million kilowatt-hours at 6.5 rulUs________________________ 3,049,800 <br />Less O.M, & R. C05t8_________________________________________ 678,0;)0 <br /> <br />Net power reyenoes________________________________________ 2,371,150 <br />Municipal and Industrial water-water supply: <br />Municipalsupplles (20,500 acre-teet at $5.40) ___________________ <br />Storage ot C.F. & I. Corp.: (4,000 aere-teet at $2) _______________ <br />Conservancy district ta:L___ _ __ ____ _______________________ ____ <br /> <br />110,700 <br />8,000 <br />210,000 <br /> <br />, <br /> <br />Subtotal___________________________________________________ <br />L.e85 0.!vI. & R. costs__________________________________________ <br /> <br />Ne.t water supply revenues_________________________________ <br /> <br />328,700 <br />11,400 <br />31i,300 <br />