Laserfiche WebLink
<br />w <br />00 <br />00 <br />~Jl <br /> <br />C0mpar-ison of the 'lnnual costs presented an the CRSS Program Schedule <br />(appendix B) with the Preliminary LCRBO (Lower Colorado River Basin <br />Development) Fund Analysis and LCRBO Fund revenue funds availa- <br />bi lity data developed by the Colorado R'iver Comm'ission of Nevada <br />(appendix C) Indicates that with the current CRWQIP Schedule the LCRRD <br />Fund waul1 not accrue sufficient cost-sharing funding to provide for <br />impleme.ltation of all the units evaluat.ed in this report without incurring <br />Interest payments. Therefore, we expect future increased emphasis placed <br />on selecting the most cost-effective units, or portions thereof, to keep <br />the construction program within the funds available in the LCRBO Fund. <br /> <br />The Priority Scheduling Program data 'included in appendix D, although, <br />prelin:'inary in nature, will provide a basic tool for analyzing and dis- <br />pI ayi flg future prog ram schedu ling. Rec I amaU on wi 11 cont i nue to work with <br />the Forum Work. Group and the staff of the Colorado River Commission of Nevada <br />to develop a comprehensive economic and financial analysis of the CRWQIP <br />during the upcbming year. A majpr goal of the Colorado River Water Quality <br />Office is to present this information, along with an updated program schedule, <br />in the September 1985 update of this report. <br /> <br />22 <br /> <br />,. <br /> <br />~i <br />, <br />11 <br />i <br />i <br />'1 <br />, <br />"~ <br />.:; <br />it <br />~j <br />:1i <br />. ,~ <br />j <br />I <br /> <br />;1 <br />) <br />i. <br /> <br />,f <br /> <br />." <br /> <br />