My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07009
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:25:20 PM
Creation date
10/12/2006 2:02:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8221.106.J
Description
Eagle-Piney
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
6/1/1974
Title
Eagle-Piney/Eagle-Colorado Water Study--Summary Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(lj <br />ClC <br />c.:- <br />- <br /> <br />SUMMARY AND CONCLUSIONS <br /> <br />C' <br /> <br />c <br /> <br />The Eagle-Piney fEagle-Colorado Water Study was prepared for the Denver Board of Water <br />Commissioners as a significant part of its continuing efforts to ensure the orderly and responsible <br />management of Denver's water resources. <br /> <br />To incorporate the Board's water appropriations in the Eagle and Piney River basins into <br />the Roberts Tunnel collection system, the study was focused on two main areas. The first was <br />the definition of the Eagle River and Piney River basins in terms of climatological, hydrological, <br />geological, topographical, and environmental parameters. The second was the determination of <br />an operational plan for integrating the Board's various appropriations which offered the greatest <br />potential benefits to the citizens to be served by this additional source of supply. The operation <br />of the appropriations in both the Eagle and Piney River basins was simulated with sophisticated <br />computer techniques to formulate the most realistic basis for responsible water management <br />considering both economics and the environment. <br /> <br />A systematic evaluation of numerous operational configurations was undertaken by <br />integrating the information obtained from the geologic. mapping, environmental, and water <br />availability programs of this study. As a result, four configurations with superior merits were <br />identified. Indepth evaluations and further screening refined the choices to arrive at the <br />recommendation that the Department develop, in stages. the valuable water resources in the Eagle <br />and Piney River basins by utilizing the collection. storage and delivery elements of the Eagle- <br />Piney fEagle-Colorado operational configuration. <br /> <br />This configuration could most efficiently incorporate the Department's appropriations in a <br />manner consistent with sound economics and proper concern for environmental values. The <br />facilities of this configuration could deliver approximately 183.000 ac-ft of water annually to <br />Dillon Reservoir. <br /> <br />The Eagle-PineyfEagle-Colorado operational configuration also provides the greatest <br />flexibility for the continuing consideration and accommodation of changing economic, <br />environmental and social factors during its implementation. <br /> <br />I <br />, <br /> <br />L <br /> <br />1 <br /> <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.