Laserfiche WebLink
<br />N <br />00 <br />C <br />.... <br /> <br />CONTENTS <br /> <br />c <br /> <br />Letter of Transmittal <br /> <br />SUMMARY AND CONCLUSIONS <br /> <br />I. INTRODUCTION <br />Pu rpose <br />Background <br />Study Area <br />Study Objectives and Methodology <br /> <br />II. CONFIGURATIONS CONSIDERED <br /> <br />III. WATER RESOURCES <br /> <br />VI. GEOLOGIC AND MAPPING <br /> <br />V. ENVIRONMENTAL EVALUATIONS <br /> <br />VI. BASES FOR RECOMMENDATION <br /> <br />VII. RECOMMENDED CONFIGURATION <br />Eagle-Piney/Eagle-Colorado Operational Configuration <br />Plan of Action <br />References <br /> <br />TABLE <br /> <br />Table 1 Estimated Construction Costs, Power Cost and Water Deliveries <br /> <br />IllUSTRATIONS <br /> <br />Plate <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br /> <br />Vicinity Map <br />Study Area Location <br />General Study Program <br />Eagle-Piney Configuration <br />Eagle-Colorado Configuration <br />Piney/Eagle-Colorado Configuration <br />Eagle-Piney/Eagle-Colorado Configuration <br />Capital Funding Plan <br /> <br />page <br /> <br />1 <br /> <br />2 <br />2 <br />3 <br />3 <br /> <br />5 <br /> <br />7 <br /> <br />8 <br /> <br />9 <br /> <br />10 <br /> <br />12 <br />12 <br />14 <br /> <br />10 <br /> <br />following page <br /> <br />4 <br />4 <br />4 <br />6 <br />6 <br />6 <br />6 <br />12 <br />